• Image-150
  • Gas Line Quote (Business Link)

  •  - -
  • OR

  • Step 1: Customer Details

  • Step 2: Installation Details

  • Note: To pass inspection, Inspector will require a receipt indicating new liner was installed OR exisiting liner is adaquate for this installation.

  • Browse Files
    Cancelof
  • Browse Files
    Cancelof
  • Note: To pass final inspection, an Electrical Underwriters Certificate must be sent or uploaded to the Minicipality Building Department and also emailed to InstallGas at christinec@installgas.com to complete our filing. 

     

  •  - -
  • Step 3: Permit Details


  • Step 4: Gas Service Details

  • *National Grid requires that a meter upgrade application be completed and submitted to verify that there is adequate gas supply from the street to the property. Please select all new and existing gas appliances at the property.
  • If Inside Meter, we need:

    - one close up picture of the front of the meter

    - step away and take one picture which shows the complete view of where the meter is located

    - if it is interior piping, take several pictures of the interior pipe route 

    Please email those pictures to johna@installgas.com

    Please note, we can not schedule an installation without these pictures. 


  • *PLEASE NOTE THAT NO WORK CAN BE DONE UNTIL NATIONAL GRID VERIFIES THAT THERE IS ADEQUATE GAS SUPPLY TO ADD THE NEW APPLIANCE(S).
  • Step 5: Important Information Needed

  • All forms and additional documentation can be attached directly to this form by uploading the file below, or by faxing a copy to 516 752-5000, or by mailing a hardcopy to our office: InstallGas.com 201 Northwest Drive, Suite1, Farmingdale NY 11735.

    1. License & Insurances
    We require proof of your license and insurances for each specific Village/Town. Please note that the appropriate Village/Town must be listed as the Certificate Holder & Additionally Insured. We will not be able to file your permit without this information.

    2. Survey and Additional Documents:
    All surveys must be legible and full size. (Generators must be clearly marked with distances to all lot lines as well as the distances from the house.) We will not be able to file your permit without this information.

  • Browse Files
    Cancelof
  • Browse Files
    Cancelof
  • 3. Additional Documents & Information (if required)
    Additional Documents: Checks to village/town for permit fee; contractor/electrician license and insurances naming the town/village as the certificate holder (some request to be additional insured); tax bills, copies of COs, specifications, customer signatures, etc. The customer is responsible for calling in final building inspection if required.

  • Browse Files
    Cancelof
  • Browse Files
    Cancelof
  • Browse Files
    Cancelof
  • Browse Files
    Cancelof
  • Browse Files
    Cancelof
  • Upload a File
    Cancelof
  • This is the end of the Business Link Form. Please hit "Submit" below and we will provide you with a contract shortly.

  • Step 6: Submit Form

  • Should be Empty: