Proposal Request Form
Before we get rolling on this proposal, we'll need some basic information about the client (this should be easy).
What kind of proposal do you need?
Commercial Market Study
Market Study + Basecamp Experience
Interior Design
Basecamp Experience
Basecamp Experience + Interior Design
AIA B101™ Standard Agreement
AIA B102™ Standard Agreement (no scope)
AIA B104™ Standard Abbreviated Form
AIA B105™ Standard Short Form
AIA C401 Consultant Agreement
AIA C401-2017
AIA G803 Amendment for consultant
DBIA 520 (Part 1)
DBIA 530 (Part 2)
DBIA 530+535 (Full Contract)
DBIA 575 Sub-Consultant Agreement
DBIA Standard Form of Amendment
Back
Next
Save
Contact Information
Client Project Type
Consultant Discipline
Your Name
First Name
Last Name
Client's Name (signer)
First Name
Last Name
Client's Job Title
Organization Name
Prime Agreement Date / Original Agreement Date
-
Month
-
Day
Year
Date
Amendment Number
Back
Next
Save
Organization Information
Site Address
Street Address
Street Address Line 2
City
State / Province
Postal / Zip Code
Is the mailing address the same?
Yes
No
Mailing Address
Street Address
Street Address Line 2
City
State / Province
Postal / Zip Code
Back
Next
Save
Proposal Details
Go ahead and give me a short description of this project (you can even upload a scope diagram if you want too).
Scope Diagram
Browse Files
Cancel
of
Please describe (in detail) the fee structure for this proposal.
Optional Services: (Check all that apply)
Field Guide
Environmental Graphics
Furniture, Fixtures, and Equipment
Basecamp
Entitlement Services
Field Guide Fee
Environment Graphics Fee
Furniture, Fixtures, and Equipment Fee
Basecamp Fee
Entitlement Allowance
Total Compensation for Basic Services (Not Including Optional Services)
Reimbursable Allowance
How much will the initial retainer be?
How many months will this engagement last?
Back
Next
Save
Revisions and Site Visit Details
Number of reviews of each Shop Drawing, Product Data item, sample and similar submittals of the Contractor:
Number of visits to the site by the Architect during construction
Number of inspections for any portion of the Work to determine whether such portion of the work is substantially complete in accordance with the requirements of the Contract Documents:
Number of inspections for any portion of the work to determine final completion:
Number of consultant site visits:
Extra Notes: (Optional)
Upload any other files that may be needed: (Optional)
Browse Files
Cancel
of
Save
Submit
Should be Empty: