Property Valuation Residual Method
  • Property valuation (residual method)

    Before starting the inspection, study the form to see the fields you need to fill. Below the fields there is a brief description of what you need to complete. Fill in as many fields as you can in front of the property during the inspection. If you have not completed the listing you can save it to continue when you are in your office. In order to do this, click the button at the bottom of the form titled "Temporary Saving for Post Processing". When you are done with all the fields you can click "Send". In fields where you fill in numbers, such as area, decimals are dotted.
  • Valuation date
     - -
  • Inspection date
     - -
  • Provided documents
  • Property information

  • The plot is
  • The plot is*
  • The above were deducted from
  • Landplot designation
  • Plot facade
  • Facade on
  • Select photos
    Cancelof
  • Location information

  • Total revenue of utilization scenario

  • Construction costs

  • Rows
  • Fees to engineers, notaries etc.

  • Financing Costs

    It is completed in case the scenario requires the borrowing of the capital or part of it.
  • Unforeseen costs

    It includes all the expenses that are difficult to predict
  • Investment revenue

    The business benefit varies depending on the project
  • Calculation of Present Value