• Member-Owned Generation Equipment Application (Solar, Wind, or Generator)

  • This information is used by Northeastern REMC to determine the required equipment configuration for the net billing interface. Every effort should be made to supply as much information as possible.

  • - Member Information - 

  •  -
  • - Contractor/Builder Information -

  •  -
    • - Description of Proposed Installation and Operation - 
    • Give a general description of the proposed installation, including a detailed description of its planned location, the date you plan to begin operation and the frequency with which you plan to operate.

    • - Product Information -  
    • Please provide as much information as possible about the equipment.

    • Generator Rating:

    • - Inverter Data -  
    • Harmonic Distorion:

    • Please attach manufacturer's cut sheet showing UL 1741 listing.

    • Browse Files
      Cancelof
    • Please attach all available calculations, test reports, and oscillographic prints showing inverter output voltage and current waveforms.

    • Browse Files
      Cancelof
    • - Additional Information - 
    • In addition to the items listed above, please attach a detailed one-line diagram of the proposed facility, all applicable elementary diagrams, major equipment, (generators, transformers, inverters, circuit breakers, protective relays, etc.) specifications, test reports, etc., and any other applicable drawings or documents necessary for the proper design of the  interconnection. Also describe the project’s planned operating mode (e.g., combined heat and power, peak shaving, etc.), and its grid coordinates if available. 

      *NOTE* There is a required one-time, nonrefundable application fee of $50.00. Once your completed application is received and approved by Northeastern REMC, a Member Service Representative will reach out to you for payment.

    • Browse Files
      Cancelof
    • - Member Agreement -

    • I hereby certify that, to the best of my knowledge, the information provided in this application is true. I agree to abide by Northeastern REMC’s Terms and Conditions for Service as listed in the Net Billing Schedule (NB-1) and return the Certificate of Completion when the Small Generating Facility has been installed.