Daily Operator Checklist
Date
-
Month
-
Day
Year
Date
1
2
3
4
5
6
7
8
9
10
11
12
:
Hour
00
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
Minutes
AM
PM
AM/PM Option
Operator
Dan Bryant
David Lane
Drake Orr
Fabien Macdonnell
Finn Klinkenberg
Jack Mobbs
Jason Paradis
Kaleb Blough
Laurence Philippo
Lindsey Manning
Lukas Scharl
Marek Stevko
Nicholas McClean
Pavel Hajek
Peter Jancovic
Rafael Pinho
Rolf Zingerli
Roman Knauer
Sara Harris
Stefan Kubis
Thomas Larouche-Thibault
Tomas Balcarek
Ulises A. Cabrera Miranda
Other
Email
Location
*
Antiochian Orthodox Church - Church Project
Ashton - Meadows 5 Bldg 10 - Phase 2
Ashton - Meadows 5 Bldg 11 - Phase 1
Ashton - Meadows 5 Bldg 11 - Phase 2
Ashton - Trinity Church
Bird Construction - Rundle Park
CCR - Peepeekisis Funeral Home (SK)
Cana Construction - Gateway at TSMV - Phase 2A
Caribou - Ptarmingan Lodge Railing
Caribou - Rundlestone Balcony
Chandos - UTI Water Treatment Plant Canmore
Continental - Bigsky 121 YC
Goodform - 900 Railway
Graham(20th) - SFCBS Arbour (SK)
Helmer Residence - Niax
Highpoint - Acent Trellis
Highpoint - Cascade
Highpoint - Cascade Fascia & Screens
John McIsaac - 404 Tranquility
Johnston Builders - Forest Park Hotel
Jonalta Properties - Beaver Street Apartments
JPL - Greeter's Hut
JY Chen - Log Railing 18 Canyon Close
Keller Construction - Belvedere Market
Matt Hoffman - Hoffman Pavilion
Melissa Mills - MillsResidence
Munter Design - Majic Residence
Range - Rundle Park Install
Rarebuilt - Pergola
SBL Contractors (20th) - Thunderchild Powwow Arbour (SK)
SCMV - Black Swift Lodge
SCMV - Malcolm Trellis
SCMV - Mountain Lynx
SCMV - TMV-1000
Studio North - 124 Arthur Laneway
Thompson Builders - Thunder Lake Prov Park
Trailside Lodges Trailside Lodge Remediation
Woodpecker
Other
Equipment
*
CombiLift Orange
CombiLift Blue
Forklift Leo
Forklift CAT
Manlift (Genie 65s)
Manlift (Snorkel TB60)
Manlift (JLG T500 - Tow behind)
Manlift (Others/Rental)
Telehandler (JLG 10T)
Telehandler (Others/Rental)
Current Hour Meter
The (5) Step Safety Procedure
Pre-Start (Walk-Around) Machine Inspection Instructions
Are the operators, safety and responsibilities manuals available?
Tire condition (if applicable) and pressure, rim condition, lug nuts tight
Boom/Mast condition, pins and retainers, welds, damaged attachments
Fuel, oil, hydraulic oil, antifreeze and battery charge levels, daily grease
Cab or platform cleanliness, dents or scratches, decals and placards
Signs of fluid leaks on engine, hydraulic cylinders, hoses or ground
Seat belt, personal harness, lanyard, anchorage points, gates and safety chains
Glass, seat, mirrors, doors, compartment covers
1. Pre-Start (Walk-Around) Machine Inspection
COMPLETED
Function Test (Machine Running) Instructions
Ground and platform controls, emergency systems, operate all functions
All hydraulic systems and their respective functions
Brakes, steering, lights, horn, warning beepers and lights
2. Function Test
COMPLETED
Work Site Inspection Instructions
Walk the intended work route, remove hazards and obstructions
Observe ground conditions, pot holes, culverts, soft or unstable zones etc.
Observe weather conditions, wind, rain, snow, ice etc.
Look for power lines, overhead obstructions, personnel and vehicle zones etc.
3. Work Site Inspection
COMPLETED
Safe Machine Operation Instructions
Have I read and understood the responsibilities, safety and operators manuals?
Have I received authorization to operate this machine?
Do I practice dual 360 degree awareness when operating?
Do I have qualified personnel on site who can help in an emergency situation?>
Do I have a functioning communication system at hand?
4. Safe Machine Operation
YES
Safe Machine Shutdown and Securement Instructions
Do I have a safe place to park the machine and secure keys at end of shift
Are lock-out tags available on machine if required?
5. Safe Machine Shutdown & Securement
YES
Is this machine safe and acceptable for operation?
YES
NO
Does this machine require maintenance?
YES
NO
Comments:
Signature
Submit
Should be Empty: