Daily Operator Checklist
Date
-
Month
-
Day
Year
2 digit month, 2 digit day, 4 digit year
Date
1
2
3
4
5
6
7
8
9
10
11
12
:
Hour
00
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
Minutes
AM
PM
AM/PM Option
Operator
Dan Bryant
David Lane
Drake Orr
Finn Klinkenberg
Jack Mobbs
Jason Paradis
Jaxson Millard
Keneth Millard
Laurence Philippo
Lindsey Manning
Lukas Scharl
Marek Stevko
Nicholas McClean
Pavel Hajek
Peter Jancovic
Rafael Pinho
Rolf Zingerli
Roman Knauer
Sara Harris
Stefan Kubis
Thomas Larouche-Thibault
William Maunder
Other
Email
Work Site
*
Work Site for PDF
Location
Ashton - 448 Cougar St
Bird Construction - Rundle Park
Cana Construction - Gateway at TSMV - Phase 2A
CCR Construction - Peepeekisis Youth Center
Clark Builders (20th) - Strathcona Food Bank
Copper Mtn (John McIsaac) - 2 Rundle Pl (Deck Extension)
Copper Mountain - 412 Mountain Tranquility
Cube Construction - Rogers Pass Discovery Centre
Gavan Construction - 3366 Panorama Ridge
Highpoint (25th) - Cascade Fire Pit Trellis
Highpoint - Cascade Fascia & Screens
Johnston Builders - Forest Park Hotel
JPL - ACE Arch Golf Course
Keller Construction - Belvedere Market
Knightsbridge Homes - Wolf Street Affordable
Krawford - Long and McQuade Cross Iron Mills
Krawford - RC Embers Sportsbook
Munter Design - Dube
Munter Design - Majic Residence
New West Luxury Homes - 224 Pondside Place
PCL (23rd) - Blood Tribe Admin Building
Pinnacle Custom Homes - Seattle Floating Home
Premier Building - The Cliff Resort
Quorex (25th) - Sturgeon Lake CFS Admin Building
Redline (25th) - Splatsin School
SCMV - Grey Wolf Lodge
SCMV - Malcolm Patio Bar
SCMV - Malcolm Trellis
SCMV - MLV 1200
SCMV - Mountain Lynx
Summit Projects (John Third) - 101 Silvertip log replacement
Trailside Lodges Trailside Lodge Remediation
Vic Lemecha - Replace logs and railings
Wedge (Craig Chambers) - Best Western Plus Banff
Withington Built - 1338 Sagert
Woodpecker
Other
Other
Equipment
*
CombiLift Orange
CombiLift Blue
Forklift Leo
Forklift CAT
Manlift (Genie 65s)
Manlift (Snorkel TB60)
Manlift (JLG T500 - Tow behind)
Manlift (Others/Rental)
Telehandler (JLG 10T)
Telehandler (Others/Rental)
Current Hour Meter
The (5) Step Safety Procedure
Pre-Start (Walk-Around) Machine Inspection Instructions
Are the operators, safety and responsibilities manuals available?
Tire condition (if applicable) and pressure, rim condition, lug nuts tight
Boom/Mast condition, pins and retainers, welds, damaged attachments
Fuel, oil, hydraulic oil, antifreeze and battery charge levels, daily grease
Cab or platform cleanliness, dents or scratches, decals and placards
Signs of fluid leaks on engine, hydraulic cylinders, hoses or ground
Seat belt, personal harness, lanyard, anchorage points, gates and safety chains
Glass, seat, mirrors, doors, compartment covers
1. Pre-Start (Walk-Around) Machine Inspection
COMPLETED
Function Test (Machine Running) Instructions
Ground and platform controls, emergency systems, operate all functions
All hydraulic systems and their respective functions
Brakes, steering, lights, horn, warning beepers and lights
2. Function Test
COMPLETED
Work Site Inspection Instructions
Walk the intended work route, remove hazards and obstructions
Observe ground conditions, pot holes, culverts, soft or unstable zones etc.
Observe weather conditions, wind, rain, snow, ice etc.
Look for power lines, overhead obstructions, personnel and vehicle zones etc.
3. Work Site Inspection
COMPLETED
Safe Machine Operation Instructions
Have I read and understood the responsibilities, safety and operators manuals?
Have I received authorization to operate this machine?
Do I practice dual 360 degree awareness when operating?
Do I have qualified personnel on site who can help in an emergency situation?>
Do I have a functioning communication system at hand?
4. Safe Machine Operation
YES
Safe Machine Shutdown and Securement Instructions
Do I have a safe place to park the machine and secure keys at end of shift
Are lock-out tags available on machine if required?
5. Safe Machine Shutdown & Securement
YES
Is this machine safe and acceptable for operation?
YES
NO
Does this machine require maintenance?
YES
NO
Comments:
Signature
Submit
Should be Empty: