>>>>New SOCX Functionality - Manual Rate Override now includes Estimate Adjustments
The Manual Rate Override option now includes a new tab delivered in the SOCX file; "Estimate Adjustments". You can now adjust our assumptions for Grading CY, Tree Clearing and Grubbing Acres, and Pre-Drilling percentages. Rough order of Magnitude estimate results are displayed in real time, with your adjustments. Set "Include Manual Rate Override" to YES to include in your estimate.
Solarology Estimate Request Intake Form
Use this form to give us information about your project. All submissions are considered an official work authorization.
Solarology Email
example@example.com
Contact Information - Required
Company Name
*
Requester Name
*
Requester Email
*
Requester Phone Number
-
Area Code
Phone Number
Request Data - Required
Request Type
*
Estimate Only
BESS Only
Estimate Refresh
Decommission Only
Indicative Estimate
Specify the type of your request. Note: "Estimate Refresh" only allows COD and Prevailing Wage changes.
Desired Estimate Completion Date
*
/
Month
/
Day
Year
Date Picker Icon
Rush Request
*
No
Yes
Include BOM?
*
No
Yes
Ideal Iteration?
*
No
Yes
Include Manual Rate Override?
*
No
Yes
Include Decommissioning?
*
No
Yes
Project Information - Required
Project Name
*
System Energized Date
*
-
Month
-
Day
Year
What is the expected system energize date.
State
*
AL
AK
AR
AZ
CA
CO
CT
DC
DE
FL
GA
HI
ID
IL
IN
IA
KS
KY
LA
ME
MD
MA
MI
MN
MS
MO
MT
NE
NV
NH
NJ
NM
NY
NC
ND
OH
OK
OR
PA
RI
SC
SD
TN
TX
UT
VT
VA
WA
WV
WI
WY
U.S. State of Project
Location
Enter an address or GPS coordinates. If a kmz is uploaded below you can skip this field.
AC kW
*
Enter target POI AC kW. If you know your total nameplate AC please identify that in the Inverter field.
DC kW
Enter target DC or ILR. We can make assumptions based on ILR, GCR, pitch or available acreage.
Interconnection Type
*
Transmission
Distribution
Select either Transmission or Distribution
Interconnection Voltage
Default assumption is 35kV for distribution and 115kV for transmission.
Sales Tax Info
If you have knowledge of project sales tax rate enter that information here. e.g. if you know project is 100% exempt you can enter "exempt".
Labor Requirements
With the passing of the Inflation Reduction Act our default assumption is "Prevailing Wage" for all scopes. If there are other/different specific labor requirements please specify here.
Major Components - Required for Solar Estimates
Racking
Most common choices are FT or SAT. But you can be more specific if you'd like; 2P-SAT, or SAT-Screw, or 1-P Nextracker, etc. If you want to assume a foundation type or refusal percentage enter that here too.
Module
Enter any descriptor text, and your target wattage (if you have one). e.g. Bifacial 400W, or Canadian Solar BiHiKu 450W, or S6 440W, or 30% 330W and 70% 420W, etc.
Inverter
Most often this is a skid kW. If you know exactly how many pads there are please enter that number as well. e.g. 20 Sungrow 3150's, or 55 TMEIC 4400's, etc.
System Design
Acres
Is the site constrained to a set number of acres?
GCR or Pitch
Enter GCR as a percentage OR pitch in feet. Default assumption is 35% for SAT and 50% for FT.
Modules Per String
If you know your Modules per string enter that here.
Parallel Strings
Number of strings paralleled together per circuit. Enter "None" or a numeric value. Default is 2 for Crystalline Modules.
Skip Stringing
Yes
No
Homeruns
PVC
Direct Bury
CAB
Trunk Line in CAB (ex. BLA)
DC Feeders
Conduit
Direct Bury
CAB
MV Raceway
Conduit
Direct Bury
MV Gear Mounting
Pole Mounted (Recloser, GOAB, Disconnect, etc.)
Pad Mounted (Recloser, GOAB, Disconnect, etc.)
MV Run to POI
Overhead
Underground
POI Location
For Distribution projects only identify/describe the POI location here. You can leave blank if clearly noted in provided layout(s).
Substation Location
For Transmission projects only. Describe/identify substation location. You can leave blank if included in provided layout(s).
GSU Transformer
Delta
Wye
HV Gen-Tie
For Transmission projects only detail any High Voltage transmission line requirements beyond the customer substation? What is the path? How far? A true estimate is NOT provided for this scope, but a placeholder will be provided in your deliverable.
Site Work
Site Access
Describe site access and distance if not specified on uploaded files.
Road Width and Depth
Default assumption is 14ft wide and 6in deep ABC if left blank.
Landscape Buffer
Default assumption is 15' wide and based on road frontage and neighboring properties.
Fencing
Default assumption is 6ft chain link with 3 strand barbed wire (7ft total height)
Tree Clearing
If you have data on tree clearing requirements enter that information here. Otherwise we'll base assumptions on civil data provided and/or Google Earth images. Some examples may include "Trees will be cleared prior to NTP, but grubbing still required" or "50 Acres of trees to be cleared and grubbed", etc.
Energy Storage
Coupling Method
None
DC Coupled
AC Coupled
kWac and kWh
Enter target kWac and target kWh. e.g. 50MWac/100MWhr, or 20MWac 4 Hour, etc.
Battery Modules
Pre-Installed
Installed in Field
Container Design
Inverter Included within Container
Standalone Inverter
Storage Details
Tells us any details about your system. Examples include container count, containers per transformer, interconnection voltage container size/capacity inverter size/count, etc...
Request Specifics - Iterations and other Notes
Iterations
If you would like us to run different iterations on this project let us know here. Some examples might be tracker vs fixed, string vs central, different GCRs or pitches, different ILRs, different module wattages, monofacial vs thin film, etc.... FYI - Indicative Estimates is priced per iteration and requires a minimum of 20 iterations. A Beta release of our Iteration Generator sheet is now available at this link: https://solarology.egnyte.com/dl/QeLuEzrQEz You can now generate your specific iterations and upload that sheet as part of your request.
Project Notes
Enter any pertinent project data you would like your estimators to consider.
Layout Specifications
Layout Requirements
If you are requesting a layout please explain specifics of your layout request. e.g. Property boundary limitations or if you want a SAT and/or FT layout, etc.
File Upload
Upload any applicable documents: Spec sheets - Modules, Inverters, Racking, BESS. Site documents - Environmental, Geo-technical. Project Documents - PVSyst, Layouts, PV Single Lines, BESS Single Lines, Zoning Site Plans, Civil, Electrical, etc.
Browse Files
Cancel
of
Submit Request
PO/Task Number Data
If you have a Task Order or Purchase Order number you want referenced on your Invoice can can enter that here.
Prove to us you are not a robot ---->
*
Submit
Print Form
Brought to you by:
Should be Empty: