You can always press Enter⏎ to continue
Cypress Chase North 3 Work Permit

Cypress Chase North 3 Work Permit

All workshould be performed by a licensed and insured contractor, this will protect youas well as the condominium for liability issues. Debris must be removed andtaken by the contractor. The use of our garbage areas for debris disposal isstrictly prohibited and fines will be imposed against the owner. If the repairsare completed during our “Bulk Pick Up” schedule, then the debris can be placedin the appropriate location designated by the association. The Bulk Pick Upschedule is posted on the garbage doors on the first floor, or in the glassshowcase by the mail boxes.  The front ofyour doorway (catwalk), must be protected from the process of thisrepair/construction. The paint on the catwalk must be protected from scratches,flooring dust etc. This includes the elevator or areas of the condominium.
14Questions
  • 1
    Press
    Enter
  • 2
    Press
    Enter
  • 3
    Press
    Enter
  • 4
    Press
    Enter
  • 5
    -
    Pick a Date
    Press
    Enter
  • 6
    Check all that applies. All tile work requires sound proofing.
    Press
    Enter
  • 7
    Press
    Enter
  • 8
    Press
    Enter
  • 9
    Press
    Enter
  • 10
    Press
    Enter
  • 11
    All deposits are non-refundable if there is any damage to condo.
    Press
    Enter
  • 12

    By signing this permit, I agree to explain these rules to the contractor who will be liable for any damages to the common elements. A copy of this permit should be given to the guard gate to allow access.

    Press
    Enter
  • 13
    Clear
    Press
    Enter
  • 14
    -
    Pick a Date
    Press
    Enter
  • Should be Empty:
Question Label
1 of 14See AllGo Back
close