Site Preparation Checklist
  • Site Preparation Checklist

    This checklist helps your Technical Brand Ambassador verify your site for commissioning. Once submitted and approved, your Technical Brand Ambassador will be able to schedule their trip.
  • We recommend you fill out this form on your phone, with your equipment in front of you.

  • Contact Details

    This will be the contact details of the person who will be on-site during the commissioning and training.
  •  -
  • Location of Jobsite

    This is the location of your Pearl Mini has been installed
  • Type of Service Purchased

    If you are unsure, please check your invoice for Line Items (Training and Commissioning or Uncrate and Assembly)
  • Assembly & Uncrate Service

  • Upload the Layout of your Equipment here, this could be:

    • A scale drawing of your space, and the equipment orientation
    • A photo of the equipment locations marked out with masking tape in your actual space.
    • A photo of your space with machine locations digitally added on
    • Any other image or document that effectively communicates machine position in your workspace.

    Layout Example Photo

  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Equipment Assembled

    Paper Packing lists are included in each crate.
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • If you are missing items, please contact your Technical Representative who will be able to help.

  • AR2: Confirm Electrical Information

  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • AR3: Confirm Air Information

  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • AR4: After Assembly

    Assembly documents can be found in the To Read First document provided to you by your TBA.
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • By signing below, I         certify and acknowledge the following:

    1. Certification of Requirements and Information

    • I have personally checked and certify that all requirements detailed in the Site Preparation Guide and the Client Requirements Commissioning Scope of Work have been fully met.
    • I certify that all other information provided herein is true and accurate.


    2. Acknowledgement of Consequences

    • I understand that if the requirements of the Scope of Work are not met upon the TBA's arrival for commissioning, change orders and additional charges may incure.
    • I acknowledge and assume full responsibility for any and all damages or harm arising directly or indirectly from any unmet requirements or the submission of inaccurate information.


  • Powered by Jotform SignClear
  • Should be Empty: