• Form 4: Written Outline of Completed Major Project with Total Costs Above $100,000 (Appendix G to Construction Project Procedures)

    To be used after the completion of projects that had total expenses above $100,000. 
  • 3. Costs

  • a. Architectural/Engineering

  • b. Environmental

  • c. Construction Components

  • d. Project Totals

  • 5. Was the project completed within the timeframe that was indicated at the inception of the project?
  • 6. For each vendor used, please provide the following:

  • Vendor 1

  • Vendor 2 (if needed)

  • Vendor 3 (if needed)

  • Vendor 4 (if needed)

  • Vendor 5 (if needed)

  • We hereby certify that the information provided in this form is accurate and complete to the best of our knowledge as of the date of our signatures below.

    (NOTE: This is NOT on Form 4 draft...should it stay since it is on the other 3 forms?)
  • Date
     - -
  • Date
     - -
  • Date
     - -
  • Powered by Office of Communications, Diocese of Rockville Centre

  • Image field 105
  • Should be Empty: