Information For A Temporary Building and/or Structure Logo
  • Information For A Temporary Building and/or Structure

    To be completed and returned with the Site Contract
  • Information For A Temporary Building and/or Structure

  • Building / Structure Information

    Maximum Height       

    Length      

    Width     

    Total Floor Area      

  • Will a Builder / Engineer supply and erect the Building / Structure for you      

    If YES please advise the company name            
    Company Contact         
    Company Phone Number         

    If NO, you intend to source and erect the structure yourselves. Please attach the Designers / Engineers Plans and PS1 below and advise Engineers contact details         and Company Name      

    If you are not attaching the plans, then it is a small non-engineered structure with the following method of restraint for wind uplift:

    Any concrete foundations to be inspected pre-pour?            

    Approximate dates of construction   Pick a Date   

    Number of Entrances / exits from Building / Structure       

    Will there be exit signs displayed?           

    Expected maximum occupancy numbers in the Building / Structure         

    Details of any proposed alarm system / evacuation procedures etc      

    Exhibitor Declaration
    I will ensure the Building(s) / Structure(s) on my site are kept safe and secure at all times and at least one fire extinguisher will be present on my site during the entire Southern Field Days Event.

       Pick a Date            

  • Should be Empty: