Equipment Failure Log
What type of log is this?
New issue (open a ticket)
Resolution (close a ticket)
Under observation (update a ticket)
Back
Next
Date
-
Month
-
Day
Year
Date
Who is reporting this?
Chris
Diane
Isaac
Lukas
Robbie
Jack
Other
What Equipment?
Please Select
P1
P2
Shrink Tunnel
Compressor
Dryer
B1
B2
CVE
Softener
Process Pump
Chiller
Equipment Status:
Up (Normal Operation)
Not Down (Functioning but at a Reduced Capacity)
Down (Nonfunctional)
Critical Failure
Type of Failure:
Please Select
Error Code
Component Break
Irregular Operation
Quality Loss
Other
Describe the Failure:
What work has been performed?
Is this issue currently resolved?
Yes
No
Tentative/Under Observation
Back
Next
Which ticket # is this related to? Look above ^
Date
-
Month
-
Day
Year
Date
Who is reporting this?
Brooks
Corbin
Ian
Isaac
Kate
Other
Equipment Status:
Up (Normal Operation)
Not Down (Functioning but at a Reduced Capacity)
Down (Nonfunctional)
Critical Failure
What work has been performed?
Back
Next
What is/was need(ed) to resolve this issue?
Please Select
Part Replacement
3rd Party Service
Settings Adjustment/Realignment
Unknown
Maintenance
Other
Additional Information:
Submit
Should be Empty: