• QCast Applications Form

    Fields marked with an * are required.
  • Version date:  December 2023

  • Date
     - -
  •  -
  • Version date:  December 2023

  • Production Methods

    Check all that apply
  • Concrete
  • Consolidation
  • Curing
  • Joint Configurations
  • Version date:  December 2023

  • Certification Type

  • This is a full plant certification*
  • If this is a full plant certification, please check all products below that are produced.

  • Storm Sewer and Culvert Pipe*
  • Sanitary Sewer*
  • Box Culvert / Three-sided Precast Structures*
  • Manholes*
  • Sanitary Manholes*
  • Other Precast Concrete Products*
  • Version date:  December 2023

  • Please let us know of your following capabilities:

  • Providing a laptop with audio and video?*
  • Access to a tablet/smartphone with strong WiFi or cellular service?*
  • Ability to electronically scan documents that are not currently available in digital format?*
  • Can you have access to a headset with a microphone?*
  • Do you have a second person who can operate your recording device?*
  • Version date:  December 2023

  • *All inspections after the first year are unannounced.  The auditing firm requires a schedule of shutdowns in order to conduct inspections when plants are operating.  All unscheduled shutdowns shall be reported to both the ACPA and the auditing firm to avoid unnecessary fees.

  • Per QCast requirements for initial certifications it is required for the plants to submit their quality manual and 2-month records of documentation following QCast. If you have those available, please attach them below. If you wish to submit these later please email them to qcast@concretepipe.org

  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Should be Empty: