STOP! FOR THE MONTHS OF April through October ONLY. October-March setups will ALWAYS be on a stand.
Important: To determine if your yard is capable of having stakes installed, please complete the following steps:
1. Take a full-length, sharpened #2 pencil
2. Go to the spot in your yard where you'd like the sign installed
3. Insert the pencil, point down, into your yard every 6 inches for at least 8 feet of length.
4. If the pencil is able to be inserted with little effort at least 6" into the soil (up to the silver part near the eraser), your yard is good for staking!
5. If your pencil cannot be inserted at least 6", water your lawn THOROUGHLY and try again in 2-3 hours. If you are able to insert the pencil at least 6" now, then please be sure to water your yard VERY well 2-3 hours prior to install.
6. If you watered your yard thoroughly and the pencil will still not go in 6", Please select "I will require a stand" on the next page.
NOTE: Outdoor setups from October- March will require a stand regardless of your selection on the next page. Indoor setups will always be on a stand.