  • INCOMING MATERIAL INSPECTION REPORT (IMIR)

  • Inspection activity at Site (Tick as appropriate)

    1. Quantity verified as per IRN/IR and found in order

    2. Inspection of Material directly received at Site as per Specification / PO Requirement.

    3. Physical condition of material satisfactory

    4. Heat/Batch/Tag Nos. mentioned on the material

    6. Site identification mark on material

    7 .Correlation w.r.t. IRN/MTC/Lab Tests Report

    8. TC verification w.r.t. IRN/Spec/QAP, etc.,

    9. Material sent for lab testing vide letter No.

    Manufacturer Test Certificates

    Verification of shop test reports w.r.t QAP

    Result : Accepted / Not Accepted