You can always press Enter⏎ to continue
Wet Fire Installation ITP
START
1
Project
Previous
Next
Submit
Press
Enter
2
Technician
First Name
Last Name
Previous
Next
Submit
Press
Enter
3
Date
-
Date
Day
Month
Year
Previous
Next
Submit
Press
Enter
4
Details
Area/level
AS2118.1-1999
AS2118.1-2017
AS2118.1-1999
AS2118.1-2017
Australian Standards
Previous
Next
Submit
Press
Enter
5
1. Appropriate fixing methods used as per Australian Standards
Previous
Next
Submit
Press
Enter
6
2. Adequate length flex droppers/pipe
Previous
Next
Submit
Press
Enter
7
3. Sprinkler head and 2 piece plate fitted to flex/pipe
Previous
Next
Submit
Press
Enter
8
4. Correct sprinkler type used for area of protection
Previous
Next
Submit
Press
Enter
9
5. All flexie fittings checked and secured
Previous
Next
Submit
Press
Enter
10
6. Pipework adequately saddled/supported
Previous
Next
Submit
Press
Enter
11
7. Pipework de-hemped
Previous
Next
Submit
Press
Enter
12
8. No open ends - all work areas checked
Previous
Next
Submit
Press
Enter
13
9. Pre checks completed before water turns back on
Previous
Next
Submit
Press
Enter
14
10. 1 hour walk test to be completed after sprinklers are pressurised
Previous
Next
Submit
Press
Enter
15
11. No leaks on all joints
Previous
Next
Submit
Press
Enter
16
Testing notes
Huge
Large
Normal
Small
Ok
quote
Created with Sketch.
Ok
Previous
Next
Submit
Press
Enter
17
IFPS Signature
Clear
Previous
Next
Submit
Press
Enter
18
Client Signature
Clear
Previous
Next
Submit
Press
Enter
Should be Empty:
Question Label
1
of
18
See All
Go Back
Submit