• Service Required

  • Disconnection

    The planned date is your preferred date for the disconnection.

    An alternative date is required should your preferred not be available.

  •  - -
  •  - -
  • Reconnection

  • If a reconnection is required, please provide a planned reconnection date (this is your preferred date) and an alternative reconnection date, should you preferred date not be available. This may be on the same day as your disconnection.

  •  - -
  •  - -
  • Requester Details

    Please enter your contact details:

  •  -
  • If you prefer us to contact a tradesperson or someone else about these arrangements, please enter their details here:

  •  -
  • Should be Empty: