• Site Details

    The ICP number can be found on your monthly power bill. 

    Your meter number can be found on the meter installed at the premise within your meter board.

  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Requester Details

  •  -
  • Legal Owner

  •  -
  • Physical Connection Details

    Please select the type of connection which currently supplies the property to be decommissioned.

  • Date for Decommission

    If you have a date that you would like the decommision completed by, please enter below. Please allow at least 10 days for the physical decommision of an ICP.

  •  - -
  • Declaration

    I/We accept that the following terms apply for the decommissioning of an Installation Connection Point (ICP) on the Counties Energy network. 

    1. A copy of this application will be provided to the energy retailer for this supply. 

    2. Decommisioning of this ICP will not occur if the site is tenanted or occupied.

    3. Counties Energy will remove any installed meters and cut the supply away at the network supply point only.

    4. Any poles, cables or other fittings on private land will not be removed by Counties Energy and will remain owned by and the responsibility of the land owner. 

    5. As the legal owner of the property or as an authorised agent for the owner I hereby apply for the decommissioning of the Installation Connection Point (ICP) on the Counties Energy electricity network.

    6.  I understand that if I want to make a connection in the future, I will be required to request a new connection, and this new connection will be subject to a capital contribution payment.