• Application type

  • Application type*
  • Site Details

    This refers to the site where the distributed generation is to be installed

  • Please state what this site will be used for*
  • Distributed Generator Details

    This is the party who owns and is responsible for the distributed generation installation

  •  -
  • Is your postal address different from your physical address?*
  • Party
  • Distributed Generation System Installer

  •  -
  • Distributed Generation Type

  • Distributed generation type*
  • Inverter Specification

  • Is the inverter AS4777 compliant? This standard ensures the inverter meets safety and performance requirements*
  • Is the inverter pre-approved? Counties Energy recognises all inverters approved by the Clean Energy Council. Visit www.solaraccreditation.com.au to search for approved inverters*
  • Proposed inverter installation date
     - -
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Battery Specification

  • Other details

  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Distributed Generation Declaration

    As the legal owner and distributed generator, we hereby request to connect a distributed generator device up to 10kW to Counties Energy Limited’s electricity network.

    We confirm that the information submitted within this application is accurate and correct.

    We hereby agree to comply with all requirements of a distributed generator as required under Part 6 of the Electricity Industry Participation Code 2010.

    We confirm that we will inform Counties Energy of any future changes to the distributed generation installation.

    We confirm that we will comply with all safety requirements as required by a distributed generator.

    We confirm that we are aware of our responsibility to arrange for the installation to be tested and inspected, prior to connection.
    We hereby accept all charges in relation to processing this distributed generation application form.

    This document must be signed by the party that seeks to become the distributed generator.  Third parties are not permitted to sign this document on behalf.

  • Date
     - -
  • Should be Empty: