Your signature, as an authorized signer for the named Contractor confirms that you agree to the following:
• You are requesting the use of a construction water meter.
• Water use within the confines of the City of Westlake must be approved by Seminole Improvement District (SID).
• Pressurized water must pass through a meter attached directly to an approved backflow prevention device.
• Water passing through construction meters is not for human consumption.
• Construction meter water may only be used for non-potable applications such as temporary irrigation, plumbing testing, toliet and wash water and other non-consumption uses.
The contractor or user shall post signs at all water outlets served with construction meter water that read, “Non-Potable Water – DO NOT DRINK”.
Customers are responsible for the maintenance and security of construction meters. Customers will forfeit entire deposits for missing meters. A prorated amount for a damaged meter will be assessed by SID. The meter may be chained, locked and sealed for identification. The chain and seal must remain intact. Removal will result in a tampering fee being assessed to the account.
SID will install construction meters at specific locations and customers will be billed for all appropriate fees and charges. Construction meters may only be moved by SID personnel.
Meter Relocations REQUIRE a relocation application to be submitted.