Street Closure for Construction Application
  • Street Closure for Construction Application

  • APPLICATIONS MUST BE SUBMITTED AT LEAST SEVEN (7) BUSINESS DAYS PRIOR TO THE REQUESTED CLOSURE DATES. 

    LATE SUBMISSION MAY REQUIRE RESCHEDULING. 

     

  • Format: (000) 000-0000.
  • Format: (000) 000-0000.
  • Map of Street Classifications

  • Please provide on traffic control plan:

    • CANNOT BE HAND DRAWN
    • STREETS MUST BE LABELED
    • Proposed detours
    • Locations of traffic control devices & signs
    • Must clearly show start and end of closure
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Dates of Street Closure

    7 Day Maximum
  •  - -
  •  - -
  • I agree to abide by the laws, ordinances, and regulations pertaining to this permit. Barricades and Traffic Control Measures are the responsibility of the owner/contractor.

    CLOSURE CANNOT BEGIN UNTIL NOTIFICATION OF APPROVAL OF THIS APPLICATION

  • Fee Schedule: (City will Determine Fee)

      Full Closure Partial Closure
    Local Street $100 $50
    Collector Street $500 $100
    Arterial Street $1,000 $250
  • prevnext( X )
    USD
    Credit Card Details
  • Clear
  •  - -
  • Should be Empty: