General Programming Questionnaire
Please be as detailed as possible in filling out the questions on this form. The more information we get from you in advance the better we will be able to understand your needs and goals.
Contact Information
Primary Contact
First Name
Last Name
Phone Number
Please enter a valid phone number.
Format: (000) 000-0000.
Email
example@example.com
School Information
School Name
Website
School Mailing Address
Street Address
Street Address Line 2
City
State / Province
Postal / Zip Code
Project Site Address (If Different)
Street Address
Street Address Line 2
City
State / Province
Postal / Zip Code
Project Parameters
Has the school established an overall project budget, and if so what is it?
Take into account that construction costs for the building are only one portion of the total project costs, and often represent only about 65% or less of the total budget with the rest being made up of site development costs, and soft costs (eg. architectural and engineering fees; furniture, fixtures, and equipment like A/V systems; contingencies; permitting and government agency review fees; etc.)
Construction Cost
Building and site work - typically what is provided by a General Contractor
Are you aware of any specific site development issues that would impact the cost of the site work - including local regulations regarding water and sewer systems, or items that would impact which areas of the site are able to be developed?
eg. wetlands, maximum developable areas, tree coverage requirements, etc.
Does your project require filing for entitlements?
eg. Conditional Use Permit, Special Use Permit, Rezoning Application, Architectural Review Board approval, etc.
Are there any specific scheduling or date deadlines you are operating under or trying to meet?
eg. Conditional Use Permit that will be expiring at a certain date unless groundbreaking commences, etc.
Have you already hired a civil engineer or surveyor to begin preliminary site investigations including an ALTA survey (boundaries, topography, easements, setbacks, etc.), environmental screening of the property (phase 1 environmental survey), and geotechnical reports (soil and rock conditions)? If so, please provide the contact information and copies of any surveys and reports.
Existing Surveys or Reports
Browse Files
Drag and drop files here
Choose a file
Cancel
of
Additional Comments:
Submit
Should be Empty: