• Image field 3
  •  - -
  • Internal Lead Field Painter on-site Checklist

  • Arrive at job site 10 min prior to start time.
  • Introduce yourself to the homeowner
  • Do a walk around with the homeowner a. Go over any concerns and needs assessment
  • Find out where tools can be washed out at.
  • Make sure trash cans are set up
  • Give homeowner estimated completion time of project
  • Call morning huddle with painting team a. Go over scope of job    b. Assign out duties to each team member
  • Do a pre walk through before doing a final walk through with the home owner
  • Once job is completed do a final walk through with homeowner a. Touch up any areas that they may have point out that need fixing
  • Do final job site walk through and make sure all tools and trash are picked up and put away
  • Pick up trash cans
  • Collect payment
  • Get signatures from Client and Sign yourself once project is completed
  • Sign off for project completion:

  • Should be Empty: