PRE TASK PLAN
Supervisor Name:
*
GC / Customer Name:
*
Date:
*
-
Month
-
Day
Year
Select the date for the report(s) being submitted
Morrow Steel Job Name:
*
Please Select
2003 TAMPA GENERAL HOSPITAL CEP EXPANSION
2005 1050 WATER STREET(BLOCK F2 NORTH)
2006 MCKAY BAY TRANSFER STATION
2036 KIRKLAND RANCH ACADEMY OF INNOVATION
2037 MOFFITT CANCER CENTER CEP PHASE 1B
2038 BAYCARE WESLEY CHAPEL NEW HOSPITAL & MOB
2040 THE BOULEVARD AT WEST RIVER(BUILDING D)
2042 UNIVERSITY OF SOUTH FL JUDY GENSHAFT HONORS COLLEGE
2045 JW MARRIOTT CLEARWATER BEACH
2103 BAYCARE WESLEY CHAPEL-MISC METALS
2104 CITI AMENITIES-TAMPA, FL
2108 CASA PEDROSO FIREHOUSE RENOVATION
2112 THE CANOPY AT WEST RIVER(T4-1, T4-P1, T4-2)
2114 WEST VILLAGES WELLEN PARK BLDG 1
2115 WEST VILLAGES WELLEN PARK BLDG 3
2116 WEST VILLAGES WELLEN PARK BLDG 5
2117 HUDSON HIGH SCHOOL RENOVATION
2118 NEW CITY HALL BUILDING DUNEDIN
2120 WEST VILLAGES WELLEN PARK BLDG 4
2126 UNIVERSITY OF SOUTH FL WELLNESS BUILDING
2127 ANGELINE AGRIHOOD WELCOME CENTER
2128 NOBLE RICE AT SPARKMAN WHARF
2129 ST. LEO UNIVERSITY BOWMAN CENTER EXPANSION
2130 CENTRAL PARK FOOD HALL-551 CENTRAL AVE
2131 CITI AMENITIES-INTERIOR PACKAGE #3
2132 THE BOULEVARD AT WEST RIVER(BUILDING T2)
2135 INNOVAGE-TAMPA
2136 HILLSBOROUGH COMMUNITY COLLEGE ADMIN BLDG
2138 ADVENT HEALTH RIVERVIEW NEW HOSPITAL & MOB
2139 RRF CAPTIVA ADAPTION NEW FACILITY
2140 SHERATON- PALMETTO
2144 NOVE SOUTHEASTERN UNIV DENTAL SCHOOL RENO
2145 TAMPA GENERAL HOSPITAL COOLING TOWER UPGRADES
2146 MOFFITT SRB ROOFTOP RENOVATION
2148 BAYCARE SOUTH FLORIDA BAPTIST HOSPITAL
2149 ST. REGIS RESORT-LONG BOAT KEY
2201 DESTIN WATER USERS WWTP
2202-DCO Energy-Platforms 404,406,407 & 408
2203 ADVENT HEALTH-CARROLLWOOD MRI REPLACEMENT
2204 WACO RESTAURANT LAKELAND, FL
2205 CBRE LAKESIDE LOGISTICS-PLANT CITY
2206 SOUTHLAKE HOSPITAL SOUTH BED TOWER EXPANSION
2207 BEACHWALK INN-CLEARWATER BEACH
2208 LAKELAND CHRISTIAN- HIGH SCHOOL BUILDING
2209 ALONSO HIGH SCHOOL GYM & STADIUM MODS
2210 Mosaic Bartow Pipe Bridge Truss Replacement
2212 CIMINO ELEMENTARY SCHOOL RENOVATION
2213 Palmetto Police Dept HQ Embeds (Furnish)
2214 STARKEY RANCH ER & HOSPITAL
2215 WSU TOWER STEEL
2216 BLUE ORGIN TCAT LOW BAY MODS
2217 Mosaic New Wales Rail and Walkway
2218 Angle Processing for Certified Industrial
Maintenance
2219 SERENA BY THE SEA
2220 WHITE ROCK M26 REPLACEMENT STEEL FABRICATION
2221 - WEST VILLAGES WELLEN PARK SHADE STRUCTURE
2222- FAWCETT MEMORIAL SURGERY & ICU EXPANSION
2223 - ADVENT HEALTH HOF LOBBY & ED EXPANSION
2224- WSU TOWER STEEL HRU 6-11 & HRU 12-15
2225-TPA Part 2 Phase 2 Monorail System Dec
2226-Martinez Middle School Reno
2227- DCO Construction Ser. Bartow Phosphate Rec Plant
2228-2022 SPP Landlord Work
2229-Winkler Substation Project-Steel Columns
2230-Edgewood Oak Apartments-Tampa Palms
2231-Mote Science Education Aquarium (SEA)
2232-The Canopy at West River (Bldg#T4.2)
2233-HCA South Tampa Memorial Hospital
2234-Cargil Salt Stair & Rails
2235-Mosiac Riverview Phos Acid Evaporation Steel
2236-Plant City Tennis Center
2237-Plant City Tournament Management Facility
2238-101 N Meridian
2239-The Metropolitan at Tampa
2240-Miles Ybor Building
2241-1991 Main Street
2242- Sarasota Memorial Hospital Behavioral Pavilion
2243-HCSB Rampello K-8 HVAC Renovations
2244-400 Central
2245-Newport and Fig Student Housing
2246-Brightline Platforms Fab Only
2247-Anthem Sky Center
2248-Tropicana Fabrication
2249-Lakeland Regional Surgical Pathology
2250-Hernando County Courts Judicial Renovations
2251-Rapid 7
2252-Mosaic Riverview Top Evaporator Platforms
2253-Edgewood Oak Apartments-Phase I and II
2254-Regal Honda New Service Building
2255-Fedex Ground Package Renovation-Tampa
2256-Sarasota Memorial Hospital Venice Bed Tower
2257-HCA Florida Fawcett Cath Lab #2
2258-Oak Hill Hospital Cath Lab Buildout
2259-Tampa International Airport Air Cargo Expansion
2260-Hillsborough Community College Brandon Campus
2261-Moffitt MIOMS Gene Engineering
2262-Tampa Heights Maifly Development
2263-Tony Martin House in Avila
2264-Cambridge Christian Upper School Building
2265-Terrace Storage Embeds
2266-Bayfront Health Ambulance Canopy
2267-Ion Labs Gummy Lab 2 Conversion
2268-Gateway Fl Heatlh Campus MOB Embeds
2269-Wellen Park Fishing Pier Pavilion
2270-Gateway Fl Health Campus MOB Embeds
2271-Schaefer Co. Teco Central Bldg C
2272- Pasco County Citizens Center Reno
2273- Manor West River
2274- Alanik Hotel Clearwater Beach
2301-Orlando Health ORMC SPD Renovation
2302-Vikin Homes-The Athena Parks Bldg.
2303-Vantage on Hillsborough
2304- HCA Bayonet Point Hospital
2305- Kitchen Renovations at Hillsborough County Schools
2306- Mosaic Riverview #8 Sulfuric Acid Plant Waste Heat Boiler
2307- Mosaic New Wales Pond Water Pipe Rack
2309- St. Pete New Sanitation Dept. Building
2310- SRQ Airport Terminal Expansion Ground Boarding
2312-Sky Puppy Brewing
2313- 1991 Main Street Parking Garage
2314- 222 S. Orange Facade Renovations
2315- Whiting Street Development
2316- Lakeland Christian Phase 1a
2317- Pasco Hernando State College Library Bldg to Walkway Reno
2318- HSD Wilton Simpson Technical College
2319- Newsome HS Auditorium & Sports Facility
2320- NEWRF Electrical & Pump Station Improvements
2321-Sligh Middle School Hockey Rink Railing
2324- Fab Work for B&M Masonry Outrigger Frames
2325- Tampa General Hospital Well Project-Access to Vault
2326- New York Life Renovation
2327- Samsung CUB Steel (Fab Only)
2328- Venice Theatre Fly Loft
2329- RJS Railing
2330-TIA Airside A&E Security Screening Expansion
2331-SRQ Airport Escalator Replacement
2332-SRQ Airport EVID Support
2333-Sarasota Memorial Hospital REI Building
2334-GasWorx W2
2335- Bradenton Convention Center
2336-Sarasota Memorial Hospital Venice ED/OR Expansion
2337-Gensler Tampa Office
2338-Advent Health-Carrollwood Pandemic Renovation
2339-Orlando VA Lake Nona Primary Care Facility Expansion
2340-Plant City Solid Waste and Utilities Admin Bldg.
2341-Harbour Bar
2342-USF Marshall Center Elevator Roof Hatches
2343-Mendenhall Elementary HVAC Updates
2344-JR Simplot IPAT Replacement
2345- Lakes Church Renovation
2346-Boasso Office Renovation
2347-Sarasota Memorial Hospital Lakewood Ranch ER
2348-Modera Encore Embeds
2401-Art House-Embed
2402-James Haley VA Tampa-Specialty Treatment Bldg.
2403-Fabrication Work for B&M Masonry
2404-Southern State Grillage and Platform Framing
2405-Brandon High School HVAC Renovations
2406-Bryan Elementary School HVAC Renovations
2407-JP Morgan Chase Highland Oaks Renovations
2408-Canopy at West River Tower 3&4-T4 Phase 2
2409- Raymond James Stadium Railing Project
2410- Renewable Natural Gas (RNG) Pipe Rack
2412- Faith Covenant Church
2413- Pinellas County Schools Leadership Project
2414- Advent Health-Meadow Pointe Offsite ED
2415- FK Marchman Technical College
2416- Hernando County West Tax Collector Bldg.
2417-Roosevelt Elementary School Renovation
2418-USF MRI Renovations
2419-FDLE Tampa Bay Regional OPS Center Renovation
2420-MetWest at Tampa
2421-Brooksville Elementary Building 5 Repairs
2422-US Gypsum Kettle Building-Fab Only
2423-TMRW Sports Broadcast Studio
2424-Skyway Lofts Phase II Angles
2425-HCPS Progress Village Arts Construction
2426- Chamberlain
2427-Pasco High School Expansion
2428-HCA South Shore Mechanical Equipment Upgrades
2429-DTCC Tampa Canopy
2430-Plant City Career Center
2431-Advent Health Wesley Chapel Expansion
2432-Orlando Health Bone Marrow Transplant Expansion
2433- Emerson Lakes (Phase 1A)
2434- Orlando Health Bayfront Hospital Cooling Tower
2435-TGH Hospital Pathology Equipment Replacement
2436-TGH Hospital Non-Invasive Cardiology Suite Reno
2437-Tampa General Hospital -Temporary Pipe Support Steel
2438-Orlando VA Lake Nona Primary Care Facility Exp (East)
2439-Pasco Hernando State College-Stem Center
2440-Moffitt-Brachy Therapy HDR Suite Renovations
2441-ER Jahna Green Bay Booster Feed Steel
2442-RJF Tower 4 Experience Project
2443-TGH Oxygen Yard Enclosure T&M
2444-JEA Curtainwall Supports-Phase 2
2445-TGH Oxygen Yard Enclosure Steel
2447-Lonza Pharmeceutical Lab Renovation
2448-HCA Citrus Hospital -AHU 48 Replacement
2449-Mosaic Plant City UFT & NR Areas Ph 4 Addition
2450-First Baptist Church Plant City
2451-Amazon Mechanical Replacement
2453-Hillsborough High School HVAC Renovations
2454-GasWorx Parcel E2 (Market Hall)
2455-Tampa General Hospital (SNT) Pavilion
Location Of Task:
*
Name of general work area where the task is being performed
Form Completion Instructions:
For the date selection below, select the actual work date for the report(s) being submitted. If you are filling out this report for a day other than the current day, you must change the date accordingly. Do not submit reports for multiple dates in one form. Furthermore, by signing below, the undersigned represents and warrants that he/she does not have a fever, cough, shortness of breath, or any other symptoms listed by health authorities as being associated with COVID- 19 (Coronavirus), and will immediately notify their supervisor and leave the site if any of these symptoms present themselves while working at the site. Further, to the best of my knowledge, I do not have any immediate family or roommates with COVID-19 symptoms.
Do You Have a Completed Paper 'Pre Task Plan' Report to Submit?
*
Yes
No
Attach/Upload Clear Photos of Completed or Handwritten DHA's.
Select All Conditions That Apply:
Other Conditions Not Listed Above: (If Any)
1) Define the scope or the work to be analyzed. 2) Break down the job down into small steps. 3) In the "HAZARD" column, identify and explain the hazards associated with each task. 4) Explain in "PREVENTION" column the steps that will be taken to eliminate the hazard associated with the step.
*
Attach Clear Photos or Files Relevant to DHA
Name
First Name
Last Name
Signature
Name
First Name
Last Name
Signature
Name
First Name
Last Name
Signature
Name
First Name
Last Name
Signature
Name
First Name
Last Name
Signature
Name
First Name
Last Name
Signature
Name
First Name
Last Name
Signature
Name
First Name
Last Name
Signature
Name
First Name
Last Name
Signature
Name
First Name
Last Name
Signature
Name
First Name
Last Name
Signature
Name
First Name
Last Name
Signature
Name
First Name
Last Name
Signature
Upload File
Upload File
Upload File
Upload File
Upload File
Upload File
Submit
Should be Empty: