Hand-over Sheet  Logo
  • Quality Assurance

    Hand Over inspection
  •  - -
  • Motion system works as indended

    - test by homing the machine 

    * ensure there are no squeaks or grinding noises and the action is smooth 

  • Heated beds

    Ensure bed heats up

    Ensure the PEI sheet is free from bubbles and damage (note there will be marks from the test print )

    Ensure the bed is flat (if muli panles are being used)

  • Cable Management

    • Confirm all cables are neat and tidy and all cable ties have been trimmed - cable must not over lap and must sit parallel to each other .
  • Panels

    • Panels all have screw 
    • Panels are sitting square 
    • Blanking panles installed if no air filter has been installed 
  • Clear
  • Clear
  • Should be Empty: