• Image field 12
  • Image field 13
  • APPLICATION FOR PERMIT TO USE AND OCCUPY

    Central Building Authority - Form 06
  •  - -
  • I hereby give notice that the building works carried out in accordance with the drawings that were submitted, reviewed and subsequently recorded by the Central Building Authority as * for * were completed on Pick a Date* and are now ready for inspection.

    Please inspect the works, including but not limited to, all electrical, plumbing, and air conditioning installations, to determine its suitability to be used and occupied in accordance with the information submitted, reviewed, and subsequently recorded by the Central Building Authority as *.

  • Format: (000) 000-0000.
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  •  - -
  • Note: This application must be submitted to the Central Building Authority within 7 days after the completion of the works.

  •  
  • Should be Empty: