QUOTE & PRE POUR INSPECTION CHECKLIST
Quotation Date
Pre Pour Inspection Date
Project Location
Client Name
Client Contact Number
Scope of Project
Inclusions
Exclusions
Type of Concrete
Crossover
Driveway Exposed Aggregate
Slab / Foundation
Polished
Decorative
Other
Depth
Reinforcement Type
Access Rating Prep
Hand Digging
Excavation
Other
Access Rating Pour
Wheelbarrow
Pump
Other
Other Requirements
Saw Cutting
Bins
Pits
Drains
Gates (Sliding)
Gates (Open/Close)
Notes for Other Requirements (Gate gradient, Numbers of bins, pits, drains or other)
Size of Area of Works
Size of Garden Beds & Discussed Widths
Existing Services
Water
Gas
Electricity
Easements
Other
Notes for Existing Services
Drawings, Images or Notes for Pre Existing Issues
Client to Acknowledge Prior to Project Commencement
Pre existing issues e.g. drainage or other have been discussed and noted
Any issues encountered and any time rectifying those issues e.g. underground plumbing etc., will be charged at $100/man hour +GST
Position and number of proposed pits and drains have been discussed and noted
Conduits and/or pipes for future landscaping have been discussed and noted
Other Tradesmen that require co-ordination with have been discussed and noted
Extra work required in addition to the original Quotation price signed by client
Other
Signed: Concrete By Bayleaf
Concrete by Bayleaf agrees to the project specifications
Signed: Client
The "Client" agrees to the project specifications
Submit
Should be Empty: