  • DIRECTIONS:

    There are two options for submitting your application. The applicant can submit a filled-out application & required site plans by clicking on the submit button at the end of the application. Option 2 you can fill out and download the application at the end of this online form, and email Mike Kieliszewski at mjk-kelly@charter.net along with all required site plans.

    Option 1 Submit Typed Form (preferred method):

    1. Please complete the online form by clicking the next button below. Once you complete the form, click the submit button. This will submit the required site plans and application to the Soil Erosion Officer. Additionally, you will have a chance to download a typed-out, filled-in copy of your application and save it to your computer. This option will be shown after you click the submit button on the last page of the form and you will then be taken to the thank you page where you can download the typed-out, pre-filled application. By default, the application will automatically be emailed to you as well. 

    Option 2 Download Filled in Form to Email:

    1. If you prefer, you can download a typed-out application after you complete the form and save it to your computer by clicking the green button below that says email form only at the end of the application. Once you click the green button, you will be directed to the thank you page where you can download the form directly to your computer and email the Soil Erosion Officer at mjk-kelly@charter.net with the filled-out application and required site plans.

  • Alpena County Permit Control Erosion Fee Schedule

  • Transportation Facilities
    To include but not limited to streets, highways, roadways - trails, and paths. 

      Plan Review Permit Fee  Total
    Up to 1/2 mile Included $160.00 $160.00
    Disturbance of ½ mile  Included $190.00 $190.00
    Each additional ½ mile or fraction thereof Included $60.00 $60.00

    Industrial/Commercial Development
    Review fees included in permit fee along with 3 inspections included in the fee.

      Plan Review  Permit Fee Total
    Up to one acre Included $260.00 $260.00
    Each additional acre included $100.00 $100.00

    Commercial projects, greater than one acre, require sealed, engineered site plans with runoff calculations, and either a signed letter of acknowledgment or a letter of credit. If the inspector feels that it is necessary to have a professional engineer review the plans submitted to the County, all review costs will be paid for by the developer.

    Utility and Corridor Development
    To include but not limited to: underground cables, above ground major transmission cables, water mains, and sewers.

      Plan Review Permit Fee Total
    0-3 feet wide disturbance $ 0.02 $ 0.02 $ 0.04
    4-10 feet wide disturbance $ 0.03 $ 0.03 $ 0.06
    >IO feet wide disturbance $ 0.05 $ 0.05 $ 0.10

    Gravel and Sand Pit Excavation
    To include any open-pit greater than one acre in size, active or inactive. Generally, a five-year permit may differ if a signed agreement is made with the agent in advance.

      Plan Review   Permit Fee Total
    Sand/Gravel Pit $150.00 $40.00 X 5 $350.00

    Waterway impoundment Construction or Improvements
    To include but not limited to: ponds, seawalls, rip rap, etc.

      Plan Review Permit Fee Total
    Up to one acre Included $160.00 $160.00
    Disturbance of one acre Included $190.00 $190.00
    Additional acre or fraction thereof Included $60.00 $60.00

    Septic Systems
    To include septic system installation, replacement, or repair not associated with other earth change activities.

      Plan Review   Permit Fee Total
    Septic System Included $160.00 $160.00

    Residential Construction and Miscellaneous Earth Changes
    To include all single-family dwellings, additions, barns, garages, and subjects not covered by or within the above categories. 3 inspections are included in the fee. 

       Plan Review  Permit Fee  Total
     Up to one acre  Included  $160.00 $160.00
     Each additional acre  Included  $75.00 $75.00

    * Additional Site Inspections for any permit, beyond three, will be charged at a rate of $50.00 per visit and will be billed to the landowner at the expiration of the permit.

    Any projects, one acre or larger, with a stormwater collection, or discharge point may require a stormwater operator for the duration of the project. Any project five acres or larger shall require a certified stormwater operator for the duration of the
    project.

    MAKE CHECK PAYABLE TO: Alpena County Treasurer

  • County of Alpena Logo
  • Permit Application For Part 91 Soil Erosion & Sedimentation Control

    Alpena County Soil Erosion 720 W. Chisholm Street, Suite 3 Alpena, MI 49707 989-354-9534

  • 2. LOCATION

  • 3. PROPOSED EARTH CHANGE

  • 0/300
  •  -  -
    Pick a Date
  •  -  -
    Pick a Date
  • 4. SOIL EROSION AND SEDIMENTATION CONTROL PLAN (Refer to Rule 323.1703)

  • Note: * complete sets of plans must be attached.

  • 5. PARTIES RESPONSIBLE FOR EARTH CHANGE

  • 6. PERFORMANCE DEPOSIT (If required by the permitting agency)
    If this does not apply to you, please put n/a or 0.

  • I (we) affirm that the above information is accurate and that I (we) will conduct the above-described earth change in accordance with Part 91, Soil Erosion and Sedimentation Control, of the Natural Resources and Environmental Protection Act, 1994 PA 451, as amended, applicable local ordinances, and the documents accompanying this application. The designated agent must have a written statement from the landowner authorizing him/her to secure a permit in the landowner's name.

  • Clear
  •  -  -
    Pick a Date
  • Clear
  •  -  -
    Pick a Date
  • County of Alpena Logo
  • Signature Authorization

  • l, the landowner agrees to authorize  to act as my authorized agent for the submittal of the Soil Erosion & Sedimentation Control Permit application for my earth change activities. Further, I agree that modifications made to the application by the County Enforcing Agent may be approved and signed by the aforementioned authorized agent upon receipt of the Soil Erosion & Sedimentation Control Permit. I acknowledge that, as the legal landowner, l am responsible for the earth change activities occurring on my site.

  • Clear
  •  -  -
    Pick a Date
  • County of Alpena Logo
  • General Conditions

  • In accordance with Rule 1709 promulgated under the authority of Part 91, Soll Erosion and Sedimentation Control, of the Natural Resources and Environmental Protection Act, 1994 PA 461, as amended, and in addition· to the information on the attached plan(s) and special conditions, the following general conditions apply to the earth change authorized by this permit:

    • D esign, construct and complete the e arth change in a manner that limits the ex posed area of  disturbed land for the shortest period of time.
    • Remove sediment caused by accelerated soil erosion from runoff water before it leaves the site  of the earth change .
    • Temporary or permanent control measures shall be designed and installed to c onvey water  around, though, or from the earth change at a non - erosive velocity.
    • Install temporary soil erosion and sedimentation control measures before or upon  commencement of the earth change activity and maintain the measures on a daily basis. Remove t emporary soil erosion and sedimentation control measures after perman e nt soil  erosion measures are in place and the area Is stabilized. ('Stabilized" means the establishment of  vegetation or the proper placement, grading, or converting of soil to ensure It s resistance to son  erosion, sliding , or other earth movements).
    • Complete permanent soil erosion control measures for the earth change within five calendar  days after final grading or upon completion of the final earth change. If It Is not possible to  perm anently stabilize the earth's change, then maintain temporary soil erosion and  sedimentation control measures until permanent soil erosion control measures are in place and  the area is stabilized.
  • 0/1032
  • Part 91, Soil Erosion and Sedimentation Control Plan Minimum Rule 1703 Requirements

    Michigan Department of Environmental Quality SESC/CSW michigan.gov/deq 800-662-9278 Rev. 4/2018
  • 0/200
  • County of Alpena Logo
  • Approximate Project Timing

    (Month/Day Approximate/Year)
  • MINOR PROJECTS:

  •  -  -
    Pick a Date
  •  -  -
    Pick a Date
  •  -  -
    Pick a Date
  •  -  -
    Pick a Date
  •  -  -
    Pick a Date
  •  -  -
    Pick a Date
  • MAJOR PROJECTS:

  •  -  -
    Pick a Date
  •  -  -
    Pick a Date
  •  -  -
    Pick a Date
  •  -  -
    Pick a Date
  •  -  -
    Pick a Date
  •  -  -
    Pick a Date
  •  -  -
    Pick a Date
  •  -  -
    Pick a Date
  •  -  -
    Pick a Date
  •  -  -
    Pick a Date
  • Site Plan Example
  • function SvgDhtupload(props) { return /* @__PURE__ */ react.createElement("svg", dhtupload_svg_extends({ width: 54, height: 47, xmlns: "http://www.w3.org/2000/svg" }, props), dhtupload_svg_path || (dhtupload_svg_path = /* @__PURE__ */ react.createElement("path", { d: "M40.213 10.172c1.897.21 3.68.738 5.35 1.58a15.748 15.748 0 014.374 3.242 15.065 15.065 0 012.951 4.533c.72 1.704 1.08 3.522 1.08 5.455 0 1.827-.28 3.654-.843 5.48-.562 1.828-1.379 3.47-2.45 4.929A13.39 13.39 0 0146.669 39c-1.599.948-3.452 1.458-5.56 1.528H37.26a1.62 1.62 0 01-1.185-.5 1.62 1.62 0 01-.501-1.186c0-.457.167-.852.5-1.186.334-.334.73-.5 1.186-.5h3.848c1.44 0 2.75-.37 3.926-1.108a10.851 10.851 0 003.03-2.846 13.53 13.53 0 001.95-3.9 14.23 14.23 0 00.686-4.321c0-1.582-.316-3.066-.949-4.454a11.623 11.623 0 00-2.582-3.636 12.857 12.857 0 00-3.742-2.478 11.054 11.054 0 00-4.48-.922l-1.212-.053-.37-1.159c-.878-2.81-2.292-4.998-4.242-6.562-1.95-1.563-4.594-2.345-7.932-2.345-2.108 0-4.005.36-5.692 1.08-1.686.72-3.136 1.722-4.348 3.005-1.212 1.282-2.143 2.81-2.793 4.585-.65 1.774-.975 3.68-.975 5.718h.053l.105 1.581-1.528.264c-1.863.316-3.444 1.317-4.744 3.004-1.3 1.686-1.95 3.584-1.95 5.692 0 2.39.8 4.462 2.398 6.219 1.599 1.757 3.488 2.635 5.666 2.635h4.849c.492 0 .896.167 1.212.5.316.335.474.73.474 1.187 0 .456-.158.852-.474 1.185-.316.334-.72.501-1.212.501h-4.849a10.08 10.08 0 01-4.374-.975 11.673 11.673 0 01-3.61-2.661 13.173 13.173 0 01-2.478-3.9A12.073 12.073 0 010 28.301c0-2.706.755-5.148 2.266-7.326 1.511-2.178 3.444-3.636 5.798-4.374.14-2.354.658-4.542 1.554-6.562.896-2.02 2.091-3.777 3.584-5.27 1.494-1.494 3.25-2.662 5.27-3.505C20.493.422 22.733 0 25.193 0c1.898 0 3.637.237 5.218.711 1.581.475 3.004 1.151 4.269 2.03a13.518 13.518 0 013.268 3.215 18.628 18.628 0 012.266 4.216zm-11.964 13.44l6.22 6.85c.245.247.368.537.368.87 0 .334-.123.642-.369.923l-.421.263c-.211.246-.484.343-.817.29a1.544 1.544 0 01-.87-.448l-3.69-4.11v16.97c0 .492-.166.896-.5 1.212-.334.316-.729.474-1.186.474-.492 0-.896-.158-1.212-.474-.316-.316-.474-.72-.474-1.212V28.25l-3.584 4.005a1.544 1.544 0 01-.87.448.959.959 0 01-.87-.29l-.42-.264c-.247-.28-.37-.588-.37-.922 0-.334.123-.624.37-.87l6.113-6.746v-.052l.421-.422a.804.804 0 01.396-.29c.158-.053.307-.079.448-.079.175 0 .333.026.474.079.14.053.281.15.422.29l.421.422v.052z", fill: "none" }))); }
    Browse Files
    Drag and drop files here
    Choose a file
    Cancel of
  • SITE SEQUENCE TABLE DEQ

  •  -  -
    Pick a Date
  •  -  -
    Pick a Date
  • Temporary SESC Measures Installed

  • Permanent SESC Measures Installed

  • Briefly describe the maintenance plan and the responsible party for each temporary and permanent SESC measure.

  • County of Alpena Logo
  • Silt Fence

    • Temporary sediment control measures
    • Use for sheet flow, not concentrated flows
    • Place adjacent to sensitive areas
    • Place at or beyond the base of the slope
    • Place on the same contour
    • Trench in 6 inches
    • Use multiple rows up the slope
    • Use support fence if necessary
    • DO NOT place in streams or ditches
    • MAINTAIN - remove accumulated sediment
    • Remove after the site is permanently stabilized

  • Silt Fence Example
  •  
  • Should be Empty: