Install Specifics
Site Details
Business Name:
*
Please enter the name of the business, site, or franchise location that will own and operate the installed Cryobuilt system. Do not enter the name of the contractor, installer, or builder.
Installation Site Address
*
Street Address
Street Address Line 2
City
State / Province
Postal / Zip Code
Name
*
First Name
Last Name
Email Address:
*
Phone Number
*
-
Area Code
Phone Number
Building Specifics
Please select a Chamber and Cryobrain Orientation. (refer to layout guide .pdf for reference below) :
*
CBL (Cryobrain on the left)
CBL90 (Cryobrain on the left perpendicular to the chamber)
CBR (Cryobrain on the right)
CBR90 (Cryobrain on the right perpendicular to the chamber)
CBB (Cryobrain behind the chamber)
Other
Upload floor plans of your site with the Everest system included reference:
*
Browse Files
Cancel
of
Layout Guide
What are the dimensions of the room/space for the Everest System?
*
i.e. 10'x10' room (use a tape measurer for accuracy)
Indoor Ceiling Type
*
T-Bar/Drop Ceiling
Open
Hard Lid
Flat
Pitched
Other
Other
What is the Floor to Ceiling Height where the cryo chamber is going?
*
Please make sure there are not obstructions above the unit like vents, lights, sprinkler heads, suspended ceiling etc.
Links:
Dimension Guide:
Peak
-
Ridge
Peak Specifications Sheet
Electrician Guide/SOW
Building Type
*
Office
Gym
House
High-Rise
Training Center
Stadium
Warehouse
Strip-Mall
Other
Other
If Other or you do not know, describe
Floor Level
*
Sub-Ground
Ground Level
Second Floor
Other
Other
If Other or you do not know, describe
Other (Please contact Cryobuilt if your floor type is not listed)
Condenser Location
*
Rooftop
Outdoor Ground
Indoor Ground
Water Cooled (check with building on details)
Roof Type
*
membrane
asphalt
metal
pitched
Other
How is the roof accessed by personnel? The access has to be from your building if not Cryobuilt must be told before install day otherwise it will cause a change order.
*
Fixed Access Ladder
Elevator
Stairs
Extension Ladder (Provided by customer)
What is the approximate distance from the Cryobrain to the condenser in terms of piping? If the condenser line runs more than 20 ft, then additional cost will be added as $125 per foot.
*
Upload condenser piping route on floor plans
Browse Files
Cancel
of
Please describe the pathway in which our piping would travel from the Cryobrain to the condenser?
*
*Please have the pathway described to the best of your knowledge in order for us to accommodate enough materials needed* Are there any obstacles that we should be aware of such as such as walls, stairwells, other piping etc ?
CryoBuilt will mount the condenser to the customer supplied curbset. Please select "Agree" that the condenser and curbset will be secured, by the customer, onto the surface it is placed on:
*
Agree
If rooftop condenser, can a crane access the rooftop? Is there a clear perimeter, free from power lines, free from trees and branches? How close can the crane park near the building?
*
If a crane is needed, how high is the roof and how far back does the crane need to extend?
*
If a crane is needed, please make sure to put the height of the building in order for the right crane to be used.
If the Cryobrain is watercooled, please select "Agree" that the customer will have the necessary specifications in place in order to make the connection of the brain to the water line:
*
Agree
Not Applicable
Is the doorway, that the brain enters, level with the outside? Meaning, we can roll in equipment without needing ramps, lifts, etc. This includes doorways inside the building. See picture below for reference. If not, describe.
*
Please describe the pathway our install team will have to take and if there are any obstacles (stairs, ramps, etc) in the way to take the brain from the unloading area to the desired location.
*
The CryoBrain is an electrical cabinet housing several components. As shown in the installation guide, it is 30" x 47" and 78" high. It weighs ~1300lbs. So we need to make sure there is a pathway free of obstacles to haul items in.
Once the CryoBrain is set in its desired location, will it have at least 3 ft. of clearance in front of its doors?
*
Yes
No
*Note* The CryoBrain is the enclosure that houses the refrigeration components and is not the chamber box. It is important to have this clearance in order to comply with local code and give space for the install team/service technicians.
The chamber has a condensate drain on the back to drain melted ice during defrost. Once the water leaves the chamber, it is the customer's responsibility to ensure it drains/evaporates safely. Please let us know which method you prefer
*
Cryobuilt's Evap Pan - most common. (Note: make sure the back of the chamber is accessible after install, and customer will be responsible to monitor its operation and dump water if it starts overflowing)
Drain sink on the ground (Best option. Has to be within 6ft of the chamber, customer must provide a floor drain prior to install team's arrival)
Drain line can be piped outside (Drain line length cannot exceed 6ft, customer must provide penetration for drain line on the first day of install)
Other
We need a space to stage our materials for the install. Do you have space indoor or outdoor such as 10ft x 20ft? Please provide space details, and specify if indoor or outdoor (i.e. size of space) --
*
Our materials are delivered to the job-site by a 53ft freight truck. Do you have a loading dock? If so , what are the dimensions and is an appointment needed? If no loading dock is available, please describe the unloading area such as empty parkinglot within 20' of entrance
*
We use a forklift and pallet jack to unload the truck. The forklift arrives the day before we begin. You will need to provide a place to park the forklift overnight:
*
Agreed
Other
Do ALL the doorways, the brain will travel through, meet the minimum requirements of 78in tall x 32in ?
*
Yes
Other
Do the doorways and hallways meet the turn requirements of the install guide? If not, can you specify dimensions? Reference image below
*
Yes
Other
A 10 yard dumpster will be provided by the customer which install team can dispose crating or will be hauled away by the customer (please note components come in large crating):
*
Agree
Available Power?
*
Yes
No
Active Internet Connection via hardwired ethernet to cryobrain location is required prior to installation
*
Agreed
Unsure
Please note that the system will need internet connection for startup
Because the Cryo Chamber operates at extreme cold temps, moisture in the air will seek out the coldest surface area to form condensation which will most likely be the cryo chamber. Any water or moisture is the customer's responsibility. We recommend keeping the space the unit will occupy in at or below 50% humidity level with ample airflow around the entire chamber. Please choose "Accept" if you understand and will keep the surrounding environment at or below 50% humidity level:
*
Accept
By signing below, you acknowledge that the above information is correct and true to fact and that any information that deviates from the above will be subject to change orders at your expense and delays of project. If you are unsure of any items, please comment on the relevant section of the onboarding platform
The condenser will need to be placed on a level surface which can either be an equipment pad, cement pad, etc. This will need to be ready for us PRIOR to installation date. Please describe what kind of pad/surface you are planning on placing for the condenser?
*
Condenser in indoor settings usually don't require a pad as long as it will sit on a level surface. The pad it sits on has to have a minimum dimension of 55" x 45".
Install ID:
Install ID is found on the top of the Phase 1 Form submission email.
Interior Wall Type
*
Drywall
Brick
Concrete
Wood
Sheet Metal
Glass Block
Glass
Other
City:
*
State:
*
Please take the time to take a look at the electrician and layout guide. Choose "Accept" if you understand and acknowledge electrical preparations should be done prior to install.
Accept
There must be enough ceiling height as outlined in layout guides before and after install. The top of the brain and chamber will need to accessible before and after install. You agree that you have referred to the layout guide to see the ceiling height requirement based on each specific layout. Please choose accept if you understand and agree to these conditions:
*
Accept
Please choose "Accept" if you understand that CryoBuilt recommends flooring that the brain and chamber are placed on to be waterproof. Condensation is common if humidity level is above 50% and water could accumulate on the floor so it is best to have flooring that won't be damaged by water.
*
Accept
Floor Type. Please note: We recommended water proof flooring.
*
Concrete
Tile
Rubber Mat
Elevated Concrete Slab
Epoxy
Post-Tension
Carpet (not recommended, best to remove)
Wood (not recommended unless waterproofed)
Other
Please note: We recommended water proof flooring.
I understand if the condenser piping run is above standard length, a change order will be added to the installation fee:
*
Agreed
There are no obstructions above the chamber/brain including vents, lights, ducts, sprinkler heads, etc
*
Accept
Save For Later
Submit