• Project site info

  • Site location - what information do you currently have?*
  • Site ownership status*
  • Do you have an electrical consultant?*
  • Requester info

  • Format: (000) 000-0000.
  • Electrical consultant

  • Format: (000) 000-0000.
  • Add a second technical consultant?*
  • Technical consultant #2

  • Format: (000) 000-0000.
  • Add a third technical consultant?*
  • Technical consultant #3

  • Format: (000) 000-0000.
  • Investigating an opportunity

  • Requested energization date*
     - -
  • Phase 1 details

  • Phase 1 project type - select all that apply*
  • Phase 1 - Residential

  • Heating*
  • Requested energization date*
     - -
  • Phase 1 - Electric vehicle chargers

  • Requested energization date*
     - -
  • Phase 1 - Commercial

  • Heating*
  • Requested energization date*
     - -
  • Phase 1 - Industrial

  • Heating*
  • Requested energization date*
     - -
  • Phase 1 - District Energy Plant

  • Requested energization date*
     - -
  • Phase 1 - Other project type

  • Requested energization date*
     - -
  • Phase 1 total loads and demand

  • Phase 1 total connected load*: {phase1-total-connected-load} kW


    Phase 1 total calculated load: {phase1-total-calculated-load} kW


    Phase 1 total maximum demand: {phase1-total-maximum-demand} kW


    *Note: Total connected load does not include residential

  • Add Phase 2?*
  • Phase 2 details

  • Phase 2 project type - select all that apply*
  • Phase 2 - Residential

  • Heating*
  • Requested energization date*
     - -
  • Phase 2 - Electric vehicle chargers

  • Requested energization date*
     - -
  • Phase 2 - Commercial

  • Heating*
  • Requested energization date*
     - -
  • Phase 2 - Industrial

  • Heating*
  • Requested energization date*
     - -
  • Phase 2 - District Energy Plant

  • Requested energization date*
     - -
  • Phase 2 - Other project type

  • Requested energization date*
     - -
  • Phase 2 total loads and demand

  • Phase 2 total connected load*: {phase1332} kW


    Phase 2 total calculated load: {phase1333} kW


    Phase 2 total maximum demand: {phase1334} kW


    *Note: Total connected load does not include residential

  • Add Phase 3?*
  • Phase 3 details

  • Phase 3 project type - select all that apply*
  • Phase 3 - Residential

  • Heating*
  • Requested energization date*
     - -
  • Phase 3 - Electric vehicle chargers

  • Requested energization date*
     - -
  • Phase 3 - Commercial

  • Heating*
  • Requested energization date*
     - -
  • Phase 3 - Industrial

  • Heating*
  • Requested energization date*
     - -
  • Phase 3 - District Energy Plant

  • Requested energization date*
     - -
  • Phase 3 - Other project type

  • Requested energization date*
     - -
  • Phase 3 total loads and demand

  • Phase 3 total connected load*: {phase1335} kW


    Phase 3 total calculated load: {phase1336} kW


    Phase 3 total maximum demand: {phase1337} kW


    *Note: Total connected load does not include residential

  • Add Phase 4?*
  • Phase 4 details

  • Phase 4 project type - select all that apply*
  • Phase 4 - Residential

  • Heating*
  • Requested energization date*
     - -
  • Phase 4 - Electric vehicle chargers

  • Requested energization date*
     - -
  • Phase 4 - Commercial

  • Heating*
  • Requested energization date*
     - -
  • Phase 4 - Industrial

  • Heating*
  • Requested energization date*
     - -
  • Phase 4 - District Energy Plant

  • Requested energization date*
     - -
  • Phase 4 - Other project type

  • Requested energization date*
     - -
  • Phase 4 total loads and demand

  • Phase 4 total connected load*: {phase1338} kW


    Phase 4 total calculated load: {phase1339} kW


    Phase 4 total maximum demand: {phase1340} kW


    *Note: Total connected load does not include residential

  • Add Phase 5?*
  • Phase 5 details

    If you have more that 5 phases, please include the rest of the project details within Phase 5.
  • Phase 5 project type - select all that apply*
  • Phase 5 - Residential

  • Heating*
  • Requested energization date*
     - -
  • Phase 5 - Electric vehicle chargers

  • Requested energization date*
     - -
  • Phase 5 - Commercial

  • Heating*
  • Requested energization date*
     - -
  • Phase 5 - Industrial

  • Heating*
  • Requested energization date*
     - -
  • Phase 5 - District Energy Plant

  • Requested energization date*
     - -
  • Phase 5 - Other project type

  • Requested energization date*
     - -
  • Phase 5 total loads and demand

  • Phase 5 total connected load*: {phase1341} kW


    Phase 5 total calculated load: {phase1342} kW


    Phase 5 total maximum demand: {phase1343} kW


    *Note: Total connected load does not include residential

  • Project totals and additional info

  • Project loads and demand


    Total project connected load*: {projectconnectedload} kW


    Total project calculated load: {projectcalculatedload} kW


    Total project maximum demand: {projectmaxdemand} kW

    *Note: Total connected load does not include residential

  • Project demand


    Project maximum demand: {projectmaxdemand} kW

  • Additional project info

  • Will you have onsite generation in parallel to BC Hydro?*
  • See our Distribution Generator Connections page for more information about onsite customer generation.

     

  • Confirm form submission

  • You may review the accuracy and completeness of your project's information by hitting the back button.

    After this information is received, the Interconnections Manager will be in touch with you to gather any other required information and then will develop a high-level servicing proposal including a preliminary estimate in accordance with the Electric Tariff.