You can always press Enter⏎ to continue
Envirocon Quote Request Form

Envirocon Quote Request Form

Thank you for your interest in Envirocon's construction systems. So we can ensure we provide the best pricing for the right solution we need you to answer a couple of questions.
22Questions
  • 1
    We need to know this so we can pick the right block system for your needs.
    • Retaining Wall
    • Fence
    • Bulk Materials Storage
    • Barrier
    • Counterweights/ Bollard Hoardings
    • Other structure
    Press
    Enter
  • 2
    Press
    Enter
  • 3
    Enter as a single number, i.e. 10.
    Press
    Enter
  • 4
    Use a comma to separate the length from the width. i.e. if they are after a bin 10m long and 3m wide, enter is as 10, 3.
    Press
    Enter
  • 5
    This relates to the pressure being exerted on the wall. Where there is a driveway or other structure behind the top of the wall the surcharge will be 12.5kpa in Auckland, and between 5- 12.5kpa outside Auckland. If there is nothing behind the top of the wall it is likely to be 0kpa.
    Please Select
    • Don't know
    • 0kPa
    • 2.5kPa
    • 5kPa
    • 12kPa
    Press
    Enter
  • 6
    This question is important as it influences what pressure the wall needs to withstand, and as a result what reinforcing options we need to allow for
    • Aggregate
    • Fertiliser
    • Glass Cullet
    • Landscape Supplies
    • PKE and/or Feed
    • Scrap Metal
    • Other
    Press
    Enter
  • 7
    Enter as a single number, i.e. 10.
    Press
    Enter
  • 8
    Press
    Enter
  • 9
    Equipment pushing against the wall can exert quite a bit of pressure on the wall so its important we take this into account during the initial quote process.
    Press
    Enter
  • 10
    This is the weight per block, in kgs. I.e. what weight block do you require?
    Press
    Enter
  • 11
    This is the total amount of blocks required.
    Press
    Enter
  • 12
    Engineered designs typically cost $3000-5000 and often required for building consents or for health and safety reasons.
    Press
    Enter
  • 13
    This may include geotech reports on the ground conditions, or structural designs for other structures on site. If they answer yes, the sales person will request the documents in the future.
    Press
    Enter
  • 14
    We need to know this in order to quote a freight price.
    Press
    Enter
  • 15
    Press
    Enter
  • 16
    The best equipment for unloading the truck is a forklift or front end loader with forks capable of lifting up to 1.8t. Excavators and cranes are also acceptable, but may cause longer unload times and therefore added cost. If you do not have equipment, the we may need need to quote for a hiab delivery.
    Press
    Enter
  • 17
    Hiring of blocks is predominantly available for counterweights, however we will also look at its use for Interbloc projects. As a general rule if the hire period is longer then 3 months, its likely going to be cheaper for them to purchase the blocks.
    • Hire
    • Purchase
    • Interested in Both
    • Don't Know
    Press
    Enter
  • 18
    • Under One Month
    • 1-3 Months
    • 3+ Months
    • Unsure
    Press
    Enter
  • 19
    • Huge
    • Large
    • Normal
    • Small
    Ok
    quoteCreated with Sketch.
    Ok
    Press
    Enter
  • 20
    Press
    Enter
  • 21
    Press
    Enter
  • 22
    Press
    Enter
  • Should be Empty:
Question Label
1 of 22See AllGo Back
close