• SYSTEM RECORD OF INSPECTION AND TESTING

  • This form is to be completed by the system inspection and testing contractor at the time of a system test. It shall be permitted to modify this form as needed to provide a more complete and/or clear record. Insert N/A in all unused lines. Attach additional sheets, data, or calculations as necessary to provide a complete record.

  •  / /
  •  / /
  • 2. TESTING AND MONITORING INFORMATION

  • 3. DOCUMENTATION

  • 4. DESCRIPTION OF SYSTEM OR SERVICE

  • 4.2 SOFTWARE & FIRMWARE

  • 4.3 System Power
    4.3.1 Primary Main Power

  • 4.3.2 Seconday Power

  • Calculated capacity of batteries to drive the system:

  • 5. NOTIFICATIONS MADE PRIOR TO TESTING

  •  - -
  •  - -
  •  - -
  •  - -
  •  - -
  • 6. TESTING RESULTS

  •  
  •  
  • 6.3 Alarm and Supervisory Alarm Initiating Device

    Attach supplementary device test sheets for all initiating devices.

    Attach supplementary appliance test sheets for all notification appliances.

    Attach supplementary interface component test sheets for all interface components.

    Circuit Interface / Signaling Line Circuit Interface / Fire Alarm Control Interface

  •  
  •  
  • 7. NOTIFICATIONS THAT TESTING IS COMPLETE

  •  - -
  •  - -
  •  - -
  •  - -
  •  - -
  • 8. SYSTEM RESTORED TO NORMAL OPERATION

  •  - -
  • This system as specified herein has been inspected and tested according to NFPA 72, 2013 edition, Chapter 14.

  • Clear
  •  / /
  • 10.1 Acceptance by Owner or Owner’s Representative:

    The undersigned accepted the test report for the system as specified herein:

  • Clear
  •  / /
  •  
  • Should be Empty: