• SYSTEM RECORD OF INSPECTION AND TESTING

  • This form is to be completed by the system inspection and testing contractor at the time of a system test. It shall be permitted to modify this form as needed to provide a more complete and/or clear record. Insert N/A in all unused lines. Attach additional sheets, data, or calculations as necessary to provide a complete record.

  • Inspection/Test Start Date/Time
     / /
    2 digit month, 2 digit day, 4 digit year
  • Inspection/Test Completion Date/Time
     / /
    2 digit month, 2 digit day, 4 digit year
  • Format: (000) 000-0000.
  • Format: (000) 000-0000.
  • 2. TESTING AND MONITORING INFORMATION

  • Format: (000) 000-0000.
  • Format: (000) 000-0000.
  • Format: (000) 000-0000.
  • Format: (000) 000-0000.
  • Format: (000) 000-0000.
  • Format: (000) 000-0000.
  • Format: (000) 000-0000.
  • 3. DOCUMENTATION

  • 4. DESCRIPTION OF SYSTEM OR SERVICE

  • 4.2 SOFTWARE & FIRMWARE

  • 4.3 System Power
    4.3.1 Primary Main Power

  • 4.3.2 Seconday Power

  • Calculated capacity of batteries to drive the system:

  • 5. NOTIFICATIONS MADE PRIOR TO TESTING

  • Date
     - -
    2 digit month, 2 digit day, 4 digit year
  • Date
     - -
    2 digit month, 2 digit day, 4 digit year
  • Date
     - -
    2 digit month, 2 digit day, 4 digit year
  • Date
     - -
    2 digit month, 2 digit day, 4 digit year
  • Date
     - -
    2 digit month, 2 digit day, 4 digit year
  • 6. TESTING RESULTS

  • 6.1 Control Unit and Related Equipment
    Rows
  • 6.2 Secondary Power
    Rows
  • 6.3 Alarm and Supervisory Alarm Initiating Device

    Attach supplementary device test sheets for all initiating devices.

    Attach supplementary appliance test sheets for all notification appliances.

    Attach supplementary interface component test sheets for all interface components.

    Circuit Interface / Signaling Line Circuit Interface / Fire Alarm Control Interface

  • 6.6 Supervising Station Monitoring
    Rows
  • 6.7 Public Emergency Alarm Reporting System
    Rows
  • 7. NOTIFICATIONS THAT TESTING IS COMPLETE

  • Date
     - -
    2 digit month, 2 digit day, 4 digit year
  • Date
     - -
    2 digit month, 2 digit day, 4 digit year
  • Date
     - -
    2 digit month, 2 digit day, 4 digit year
  • Date
     - -
    2 digit month, 2 digit day, 4 digit year
  • Date
     - -
    2 digit month, 2 digit day, 4 digit year
  • 8. SYSTEM RESTORED TO NORMAL OPERATION

  • Date
     - -
    2 digit month, 2 digit day, 4 digit year
  • Time
  • This system as specified herein has been inspected and tested according to NFPA 72, 2013 edition, Chapter 14.

  • Date
     / /
    2 digit month, 2 digit day, 4 digit year
  • Format: (000) 000-0000.
  • 10.1 Acceptance by Owner or Owner’s Representative:

    The undersigned accepted the test report for the system as specified herein:

  • Date
     / /
    2 digit month, 2 digit day, 4 digit year
  • Format: (000) 000-0000.
  •  
  • Should be Empty: