Eiffel Group New Contractor Orientation
Language
  • English (Canada)
  • French (Canada)
  • Site Specific Orientation

    for new workers/contractors to a work site
  •  - -
  •  - -
  • Site Information

  • Site Address

    Rosewood, 540 14 Avenue SW, Calgary, AB

    Site Contacts

    Project Manager- Noah Scott. 587-582-9822
    Site Supervisor- Matt Sloane 403-860-2171 Pablo Jaramillo 587-575-4051
    Health & Safety Advisor- Andrea Glowatsky (587) 578-9415
    Client Liaison- Alejandro Urizar 587-582-7790

  • Site Address

    Montana: 817 15th Ave SW, Calgary AB

    Site Contacts

    Project Manager- Noah Scott. 587-582-9822
    Site Supervisor- Robert Ashton, 403-473-7324
    Health & Safety Advisor- Andrea Glowatsky (587) 578-9415
    Client Liaison- Alejandro Urizar, 587-582-7790

  • Site Address

    Job # 183-31 8th Floor Demising Wall - 11012 Macleod Trail

    Site Contacts

    Project Manager- Rod Danforth : 587-576-5333
    Site Supervisor- Darren Sarada : 403-804-7895
    Health & Safety Coordinator- Cody Thompson : 403-700-2639
    HSC Representative- Cody Thompson : 403-700-2639

  • Site Address

    Job # 374-15, Montana Gym, 817 15 ave sw, calgary, AB

    Site Contacts

    Project Manager- Rod Danfourth: 587-576-5333
    Site Supervisor- Darren Sarada: 403-804-7895
    Health & Safety Advisor- Cody Thompson; 403-700-2639

  • YGC-452-1 Master Bedroom Renovation

    Site Address

    5 Spruce Bank Crescent

    Site Contacts

    Project Manager: Rod Danforth : 587-576-5333

    Site Supervisor: Darren Sarada : 403-804-7895

    Foreman: N/A

    Health & Safety Advisor: Cody Thompson : 403-700-2639

  • YGC- Southcenter Mall

    Site Address

    100 anderson Rd SE

    Site Contacts

    Project Manager - Rod Danfourth: (587)-576-5333

    Site Supervisor - Darren Sarada: 403-804-7895

    Health & Safety Advisor - Cody Thompson (403) 700-2639

     

  • Site Scope of Work

  • Site

    No specific scope of work available

  • Rosewood

    General unit repairs and/or Emergency Property Restoration

  • The Montana

    General unit repairs and/or Emergency Property Restoration

  • Montana Gym

    gym renovation, site demo and reface gym.

  • YCH-183-31-8th Floor Demising Wall

    Demising Wall on the 8th floor

  • YGC-452-1 Master Bedroom Renovation

    Extension to master bedroom.

  • YGC - Southcenter Mall

    general site demo, painting & construction work scope constantly changing

  • Site Hours

  • {workSite}

    This site is open from 7am - 7pm, Mon - Sat

  • YGC-452-1 Master Bedroom Renovation

    This site is open from 8:00am - 4:30pm

  • To work outside the hours below please get permission from the site supervisor.

    You are required to sign in daily QR code is located at the main site entrance. You will also see a link to sign in after completing your orientation.

  • Preferred Loading Practices

  • {workSite}

    When bringing material to this job site, check with the site supervisor for specific unloading instructions.

  • Site Facilities

  • {workSite}

    CELL PHONE USE: is for emergency purposes only

    SMOKING: is not permitted on site

    SITE SAFETY STATION: check with the site supervisor

    PARKING: check with the site supervisor

    WASHROOMS: check with the site supervisor

     

  • YCH-183-31 8th Floor Demising Wall

    LOCKBOX: 

    CELL PHONE USE: For emergency purposes only

    SMOKING: Not permitted on site

    SITE SAFETY STATION: Located at the site entrance

    PARKING: Park at the entrance of the site 

    WASHROOMS: Located on-site

     

  • YGC- 374-15 Montana Gym

    LOCKBOX: Front Desk 

    CELL PHONE USE: is for emergency purposes only

    SMOKING: is not permitted on site

    SITE SAFETY STATION: check with the site supervisor

    PARKING: check with the site supervisor

    WASHROOMS: check with the site supervisor

     

  • YGC-452-1 Master Bedroom Renovation

    CELL PHONE USE: is for emergency purposes only

    SMOKING: is not permitted on site

    SITE SAFETY STATION: check with the site supervisor

    PARKING: Park across the street

    WASHROOMS: Located on-site

     

  • Muster Point & Evacuation Route

  • Here are the muster points, and other important site locations, take a moment to familiarize yourself with these locations. In case of an emergency, you would need to know where to muster too.

  • YCH-183-31-8th Floor Demising Wall

    Muster Point: Marked signs in parking lot

    Directions to Nearest Hospital:

    Continue to Bonaventure Dr
    3 min (600 m)

    Take 14 St SW to 75 Ave SW
    8 min (6.8 km)

    Follow 75 Ave SW to your destination

     

  • YGC-306-1-Century Park Plaza

    Due to the large footprint of the area, and the nature/use of the buildings, several muster points have been determined.

    Caution for traffic will be exercised with the assistance of on-site construction management staff.

     

  • Montana

    Primary/front of Building: in front of Consulate Building to the East Secondary/Back of Building: behind the Consulate Building to the East.

    At the Sound of an Evacuation Tone all workers will proceed with the evacuation procedures as outlined in the facility evacuation plan.

    This should be performed as quickly and orderly as possible. Workers are to evacuate the building and proceed to the muster point located at the east side of the building.

    Vacate the floor area via the nearest safe exit or stairwell. Once outside proceed to the designated muster point (East end of building). WALK, DO NOT RUN.

    Do not gather at the front of the building.

    Do not return to the building until it is declared safe by the Calgary Fire Department and the facility management.

    Montana

  • YGC- 374-15 Montana Gym

     

    Muster Point:  main door entrance, or behind building beside trash bins

    Directions to Nearest Hospital: 

    via Elbow Dr SW

     14 min 10.7 km via Crowchild Trl SW
     16 min 12.0 km via Crowchild Trl SW and 14 St SW

  • YGC-452-1 Master Bedroom Renovation

    Muster Point: Across the street from the residence

    Directions to Nearest Hospital:

    Head southeast on Spruce Bank Crescent SW toward Spruce Dr SW
    40 sec (150 m)

    Continue on Spruce Dr SW. Take Bow Trl SW, Parkdale Blvd NW and 29 St NW to Hospital Dr NW
    10 min (6.5 km)

    Continue on Hospital Dr NW to your destination

  • YGC-Southcenter Mall

    Muster Point: near SOUTH TOWER

     

    Directions to Nearest Hospital:

    via 14 St SW S and Anderson Rd S W
    Fastest route, the usual traffic

    Details 11 min 6.7 km via Elbow Dr SW

    11 min 6.9 km via 14 St SW S

  • Hazard Assessments

  • Hazards exist in many forms. They can be visible or hidden, a condition or an act.  Control of hazards are necessary to ensure the site is safe before you start work. 

    Recognition of hazards is a critical step of any health and safety program.

    You will be required to assist with completion of digital e-Hazard Assessment (field level hazard assessment), identifying, reporting, and controlling hazards, which must be completed daily, and copies submitted to Eiffel Group.

  • General Site Safety

    1. Wear PPE at ALL TIMES
    2. You MUST attend Tool Box Meetings and any other safety meetings.
    3. Good housekeeping in your work area is mandatory 
    4. Protective guards must be left in place. Never block or remove a guard.
    5. All environmental spills must be immediately reported to your supervisor.
    6. NO smoking on site
  • Contractor Safety Responsibilities

  • It is the responsibility of ALL to:

    • Complete this site safety orientation prior to commencing work and be familiar with the site evacuation procedures (Initiating an alarm).
    • Follow all safe work practices and/or procedures that are provided.
    • Immediately report to your supervisor any hazardous condition or work practice.
    • Refuse any work assigned that is considered to be unsafe or has the potential to be unsafe.
    • Notify your direct supervisor of any medical condition or limitation that may hinder their ability to safely perform the assigned duties.
    • Immediately report any injury sustained at work to your supervisor and receive first aid or medical help without delay.
    • Report any anticipated loss of working time as a result of a work-related injury to your supervisor as soon as possible.
  • Personal Protective Equipment (PPE)

  • You must know how to use, inspect before use & maintain all PPE required for each task.

    Minimum PPE for this construction job site that must be worn:

    • steel toed boots
    • hard hat
    • hi-vis vest

    As required and based on task hazard assessment:

    • Eye and Ear protection
    • Gloves
    • Fall Protection Equipment is required when working at height
    • Dust masks and respirators
  • ERP - Initiating an Alarm

  • If an emergency is discovered in the construction zone during operational hours:

    1. The area will be evacuated immediately

    2. Emergency response initiated (911)

    3. Site Supervisor notified by radio or cell phone that there is an emergency in the construction zone.

    4. Air horns and siren will be activated initiating a complete evacuation, sounded in three (3) sharp blasts, followed by a five (5) second delay, then three (3) more sharp blasts.

    5. All first aiders will be clearly identified by the green "Certified First Aider" sticker on their hard hats.

  • ERP - Site Evacuation Procedure

  • {workSite}

    On initiating an alarm, all workers must:

    • stop work
    • turn off and make safe all equipment
    • quickly and calmly make your way to the nearest muster point
    • alert others of the situation enroute
    • do not return to the work site until given the all clear by emergency personnel
  • Incident Reporting

  • Workers are responsible to report to their site supervisor ALL incidents, and unsafe acts including but not limited to:

    1. unsafe work practices
    2. unsafe work conditions
    3. incidents
    4. occupational illness
    5. near misses
    6. violence and harassment

     

  • Knowledge Check

  • Knowledge Check

  • Knowledge Check

  • Knowledge Check

  • Knowledge Check

  • Knowledge Check

  • Knowledge Check

  • Knowledge Check

  • Knowledge Check

  • 9. This WHMIS pictogram stands for:

  • Knowledge Check

  • By signing here, you acknowledge you have read and understood this safety orientation.

  • Clear
  • You have not answered enough questions correctly to pass.

    You need 7/10 correct.

    Your Score: {totalScore}/10

    Please go back and review your answers

  • CONGRATULATIONS YOU HAVE PASSED! 

    Your Score: {totalScore}/10

    Please submit your orientation below.

    Welcome! Please work safe and refer to your supervisor with any questions

  • Should be Empty: