Cameo Preinstallation Checklist
  • Cameo Preinstallation Checklist

    Cameo Preinstallation Checklist

  • This completed pre-installation checklist must be submitted before any installation is scheduled. Please email any questions to install@eversys.com

  •  / /
  • Electrical Requirements

    Confirm all the following electrical requirements are installed and tested.
    • L6-30R within 36” of the machine 
    • X to Y: 220v 
    • X to G: 110v 
    • Y to G: 110v

    L6-30R

  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Image-47
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Plumbing Requirements

    Confirm all the following plumbing requirements are installed and tested.
  • Water Supply Requirements

    • Shut-off valve with 3/8" compression fitting within 36" of the machine.
    • Constant 30-60 psi line pressure.
    • Constant 1+ gallon/minute flow rate.

  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Drain Requirements

    • 1+" diameter hard pipe with drain cup within 36" of machine.
    • Rated to withstand 200F liquids.
    • Air gap X to prevent possible backflow.
    • X = 4+" between drain hose and liquid (see image below)

  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Machine Placement

    Confirm the following machine placement requirements are met.
  • Image-21
  • Image-26
  • Installation Day Supplies

    Confirm all supplies necessary for installation are available.
  • Image-23
  • NOTICE: If installation cannot be completed due to site conditions (e.g., incorrect utilities, lack of supplies for calibration, etc.), a Penalty Charge of $500 USD will be assessed. This penalty will be assessed each time the installer visits and is unable to complete the installation. By submitting this form you certify that the site is completely ready for installation.