PM Checklist - UPS 
  • Uninterruptible Power Supply Checklist

  • METHOD OF TESTING

    1) Record data for mode Line from Power Backup supply unit.

    2) Plug in load Tester unit at socket outlet refort and switch ON supply.

    3) Switch OFF supply for Power Backup supply unit.

    4) Wait for 30 minutes to complete load test cycle.

    5) After complete cycle, record data for mode Battery and Testing Result

    6) Switch ON supply for Power Backup supply unit and dismantle load tester.

  • Factory 1 Retort

  • Mode - Line (Supply On)

  • Mode - Line (Supply Off)

  •  / /
  • Clear
  • Factory 2 - Retort 17 & 18

  • Mode - Line (Supply On)

  • Mode - Line (Supply Off)

  •  / /
  • Clear
  • KMG Water Spray Retort - Retort 20

  • Mode - Line (Supply On)

  • Mode - Line (Supply Off)

  •  / /
  • Clear
  • LAGARDE Retort - Retort 19

  • Mode - Line (Supply On)

  • Mode - Line (Supply Off)

  •  / /
  • Clear
  • KMG Saturated Steam Retort - Retort 21

  • Mode - Line (Supply On)

  • Mode - Line (Supply Off)

  •  / /
  • Clear
  • Retention : 3 + 1 Years

     

  • Revision : F-07-12-05 (6)

  •  
  • Should be Empty: