All site issues must be reported to Greenstone Building Products (GSBP) for review and approval before the undertaking of any remedial action regardless of complexity, cost, or responsibility for the issue. Acceptable site issues include:
i. Modification to the building package, including the removal of components or the addition of components/accessories not originally supplied by GSBP.
ii. Expenditures by the builder for additional labor, materials, or services for which reimbursement will be sought.
iii. The reporting of all site issues that GSBP design certification remains in effect. Modifications made without GSBP knowledge and approval may nullify the design certification on the building package.
1.0 Initial Report: To make an initial report regarding a site issue, error, or defect, complete the form below. Our technical service representative will review your report and connect with you to resolve the issue.
2.0 Claim for Reimbursement: The builder must file a final claim with GSBP for reimbursement of any remedial work or expenditures approved by GSBP in the initial claim. The final claim must be submitted via the online form sent provided by the GSBP technical representative following claim approval. All final claims must be submitted within 10 days following the completion of the authorized corrective work.
2.1 The claim for reimbursement must include the following:
a. Formal invoice indicating the specific manhours, labor rate, and material expended for each item. A copy of the erector’s invoice or timesheets is preferred. (Note: overhead, supervision costs, and profit are not covered in claim reimbursement).
b. Field measurements and/or photos as requested by GSBP during the initial claim. These are used not only to verify the issue but to assist Greenstone’s Quality Control department in correcting or preventing future occurrences.
c. Any documentation including approval and drawings received from Customer Service during the initial claim.
d. Name of the Customer Service Representative contacted during the initial claim.
e. Final claims submitted for unreported issues may be subject to processing delays, partial payment, and/or denial.
2.2 Items excluded from claims: Unless the builder has made special arrangements with GSBP in writing before order acceptance by GSBP, claims for the following will not be honored:
a. Late shipment/delivery of material to job site or completion penalty clauses.
b. Failure of materials to arrive in an erectable sequence. Unloading time for multiple jobs shipping on the same trailer.
c. Damaged panels as a result of transit and or storage moisture or wet storage.
d. Lost time and equipment charges, travel time, and subsistence due to later arrival or short shipment of material.
e. Charges for builder/customer overhead or anticipated profit loss due to GSBP errors.
NOTE: it should not be assumed that GSBP will accept responsibility for corrective work or dollars spent without prior GSBP knowledge and authorization of the work performed.