Site Requirement Checklist  Logo
  • Site Requirement Checklist

    Site Requirement Checklist

    DRIVE THRU AND HEADSET COMBO
  •  - -
  • PLEASE NOTE- AS A STANDARD, WE REQUIRE 2-3 BUSINESS DAYS TO ARRANGE YOUR DELIVERY AND A MINIMUM OF 2 WEEKS TO COORDINATE YOUR INSTALLATION ONCE YOUR MERCHANDISE HAS BEEN DELIVERED & YOUR INSTALLATION INFRASTRUCTURE IS READY.THE DATE SELECTED IS NOT A GUARANTEED INSTALLATION DATE AND CANNOT BE BEFORE YOUR LEAD TIME.

  • Photo Requirement #1  Concrete Pad

    Please see example picture.We need a photo of the concrete pad, bolts, nuts & washers with measurements.

  • Image-12
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Photo Requirement #2 Conduits & Pull Strings

    Please see example picture. We need a photo of the conduits & pull strings with your electrical wiring in place.

  • Image-32
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Photo Requirement #3 Electrical

       Electrical Requirements. Please see example picture GFCI Breaker or Surge Protector

  • Image-37
  • Image-36
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Photo Requirement #4 Network Connection

    Please provide a picture of your ethernet set up with the assigned ports for your menu boards.

  • Image-47
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Photo Requirement #5- Headset

    Please see example picture- For your headset installation you will need an electrical outlet for the base station.

  • Image-43
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • I hereby certify that the information provided on this form is true and correct.

  • Clear
  • For any questions or concerns, please contact Reddie Group at:  

    operations@reddiegroup.com or (516) 881-7782

  • Should be Empty: