•  

    RS 1823 Rate Redesign

    This section seeks your feedback on BC Hydro's proposal for the default transmission service rate (RS 1823)

  • If unsure, please explain on the comment box below.

  • Transition Options

    This section seeks your feedback on the transition options presented by BC Hydro.

  • Transition Options

    This section seeks your feedback on the transition options presented by BC Hydro.

  • Rows
  • TSR Portfolio Impacts

    This section seeks your feedback on prospective impacts to other rates in the TSR portfolio that would arise if the RS 1823 stepped rate is replaced with a flat rate.

  • RS 1880 - Standby and Maintenance Service

  • RS 1891 - Shore Power Service

  • TSR Portfolio Impacts

    This section seeks your feedback on prospective impacts to other rates in the TSR portfolio that would arise if the RS 1823 stepped rate is replaced with a flat rate.

  • RS 1892 - Freshet Rate

  • RS 1893 - Incremental Energy Rate

  • TSR Portfolio Impacts

    This section seeks your feedback on prospective impacts to other rates in the TSR portfolio that would arise if the RS 1823 stepped rate is replaced with a flat rate.

  • RS 1892 and RS 1893 

  • Time-of-Use Rate

    This section seeks your feedback on the conceptual industrial Time-of-Use rate presented by BC Hydro.

  • You may skip to Q23 on Page 11.

  • Time-of-Use Rate

    This section seeks your feedback on the conceptual industrial Time-of-Use rate presented by BC Hydro.

  • Winter peak to off-peak TOU price ratio

  • TOU peak winter-period

  • Time-of-Use Rate

    This section seeks your feedback on the conceptual industrial Time-of-Use rate presented by BC Hydro.

  • Final comments

  • Consent to use personal information

    Personal information includes comments and contact details. This information is collected and protected by BC Hydro in accordance with the Freedom of Information and Protection of Privacy Act. Personal information is not considered, in any way, to reflect the express or implied views of the company you represent. Comments submitted will be used to inform BC Hydro’s customer service and rate design efforts for transmission service rate customers. Data received may be stored outside of Canada.

  • Should be Empty: