Hot Work Permit_Murray Library
  • Hot Work Permit - Murray Building Renewal Specific

    HSEOP-10-12
  • Seek an alternative / safer method if possible!

    This permit requires 72 hours notice prior to work commencing.
  • This Hot Work Permit is required 72 hours in advance of any operation that involves burning, welding, using an open flame, fire, or spark-producing tools, or that produces a source of ignition. This work includes, but is not limited to, welding, brazing, cutting, grinding, soldering, thawing pipe, torch-applied roofing, and chemical welding.

     

  •  / /
  • Format: (000) 000-0000.
  • THIS PERMIT IS GOOD FOR 24 HOURS

  • Requirements within 35 ft. (11m) of hot work:

  • Requirements for hot work on walls, ceilings, or roofs:

  • Requirements for hot work on enclosed equipment:

  • Requirements for hot work fire watch and fire monitoring:

  • Clear
  • Clear
  • Clear
  • I verify that the above location has been examined, the precautions marked on the checklist above have been taken, and permission is granted for this work.

  •  