In order to configure your PDU-90, you will need to:
Please note: O-Band Interlocking is based upon standard Senergy grooves and spacing: 5mm grove radius, 32 mm groove center to center, and end groove 51 mm from end bearing. Contact Pulseroller for non-standard groove spacing requirements
Error: You must have a conveyor Between Frame (BF) minimum dimension of 400 mm to select O-Band Interlocking. You have entered a value of {enterThe}. You must select Micro-V Interlocking for this BF dimension.
You can choose to either provide your own mounting bracketry for the PDU-90 unit or provide some more of your conveyor dimensions and have Pulseroller include mounting brackets that fit your conveyor
Each PDU-90 can include Pulseroller designed mounting brackets on each side that mate to the bottom flange of your conveyor frame. By default, the bracket flange is the same width as the convyeor bottom flange. The mounting holes on both the conveyor bottom flange and the PDU-90's mounting bracket must align so that the transfer belts can be lifter through the spaces between the conveyor rollers.
In general, it is assumed that the mounting holes on the conveyor bottom flange align with the conveyor roller spacing. If this is not the case, you will need to enter an offset dimension.
ERROR: The sum of C + E must be 158 mm or less for 3" or 75 mm roller spacing and 188 mm or less for 4" roller spacing
Please note that motor controllers are ordered separately. This selction determines which motor technology is used for the PDU-90's construction.