Sub Contractor Details
Sub Contractor Name
*
Sub Contractor Email
*
example@example.com
Back
Next
Save
Client Details
Company Name
*
Customer Name
*
Date
-
Day
-
Month
Year
Date
Full Address (Location of work)
*
Post code
*
Back
Next
Save
Site Specific Requirements.
Task / Activity:
Condensers
Back
Next
Save
Layout
Please give details:
Upload Photos, PDFs, Videos or any file relevant to the survey
Browse Files
Drag and drop files here
Choose a file
Cancel
of
Back
Next
Save
Risk Assessment Summary
Please give details:
Choose a grading:
*
GREEN SITE: All hazards are of a low risk. Site handover not necessarily required so long as all control measures have been assessed and Safe Systems of Work fully implemented and communicated.
AMBER SITE: All identified risks are medium to high and specific site requirements or additional controls are needed, and must be addressed, by the relevant Manager responsible for the engineers on site prior to any work being carried out.
RED SITE: Identified risks suggest it is an unsafe site. A further site specific Risk Assessment and Method Statement, or additional controls, must be put in place by the relevant Manager responsible for the engineers on site prior to work being carried out.
Back
Next
Save
Sheet Sign Off
Contractor Site Visit Arrival & Departure Time
*
Please confirm the above date and time of engineer arrival and departure
Plus the details established by the engineer all appear to be ok
Engineer Name
*
Engineer Signature
*
Customer Name
*
Customer Signature
*
Save
Office 2, Cecils Barn, Field House Farm, Dunnings Lane, Brentwood Essex, CM13 3HE
Should be Empty: