Subdivision or Industrial Connection- High-Level Application v1 Logo
  • Development Site Location

    The site location is the legal parcel of land in which you require Counties Energy to supply an electricity connection.

  • Requester Information

  •  -
  • Site Plans

    We must have an approved site plan submitted with this application, this must show any existing services that have been identified. These plans must have the subdivision proposed layout as well as any streetlight design plans.

    Where possible please provide a CAD design.

  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Declaration

    As the legal owner of the property or as an authorised agent for the owner I hereby apply for a new or updated point of supply to the Counties Energy electricity network. 

    I confirm that I am duly authorised to sign this application and confirm that the Owner agrees to be bound by the terms and conditions as stated by Counties Energy Limited and hereby accepts all charges in relation to this application.

  •  - -
  • Should be Empty: