Transportation Facilities
To include but not limited to: streets, highways, roadways -public/private, trails and paths.
| |
Plan Review |
Permit Fee |
Total |
| Up to½ mile |
Included |
$180.00 |
$180.00 |
| Disturbance of½ mile |
Included |
$210.00 |
$210.00 |
| Each additional½ mile or fraction thereof |
Included |
$ 70.00 |
$ 70.00 |
Industrial/Commercial Development
Review fees included in permit fee along with 3 inspections included in fee.
| Up to one acre |
Included |
$280.00 |
$280.00 |
| Each additional acre |
Included |
$110.00 |
$110.00 |
Commercial projects, greater than one acre, require sealed, engineered site plans with runoff calculations, and either a signed letter of acknowledgment or a letter of credit. If the inspector feels that it is necessary to have a professional engineer review the plans submitted to the County, all review costs will be paid for by the developer.
Utility and Corridor Development
To include but not limited to: underground cables, above ground major transmission cables, water mains and sewers.
| Minimum Permit Fee |
Included |
$280.00 |
$280.00 |
| 0-3 feet wide disturbance |
$ 0.04 |
$ 0.04 |
$ 0.08 |
| 4-10 feet wide disturbance |
$ 0.05 |
$ 0.05 |
$ 0.10 |
| >IO feet wide disturbance |
$ 0.07 |
$ 0.07 |
$ 0.14 |
Gravel and Sand Pit Excavation
To include any open pit greater than one acre in size, active or inactive. Generally a five year permit may differ if a signed agreement is made with the agent in advance.
| Sand/Gravel Pit |
$175.00 |
$50.00 X 5 |
$425.00 |
Waterway lmpoundment Construction or Improvements
To include but not limited to: ponds, seawalls, rip rap, etc.
| Up to one acre |
Included |
$180.00 |
$180.00 |
| Disturbance of one acre |
Included |
$210.00 |
$210.00 |
| Additional acre or fraction thereof |
Included |
$ 70.00 |
$ 70.00 |
Septic Systems
To include septic system installation, replacement or repair not associated with other earth change activities.
| Septic System |
Included |
$180.00 |
$180.00 |
Residential Construction and Miscellaneous Earth Changes
To include all single family dwellings, additions, barns, garages and subjects not covered by or within the above categories. 3 inspections included in fee.
| Up to one acre |
Included |
$180.00 |
$180.00 |
| Each additional acre |
Included |
$ 85.00 |
$ 85.00 |
* Additional Site Inspections for any permit, beyond three, will be charged at a rate of $70.00 per visit and will be billed to the landowner at the expiration of the permit. Any projects, one acre or larger, with a storm water collection, or discharge point may require a storm water operator for the duration of the project. Any project five acres or larger shall require a certified storm water operator for the duration of the project.
MAKE CHECK PAY ABLE TO: Alpena County Treasurer
CommissionasH.istory,.Soil Erosion2022Erosion Fee Schedule
Updated 01.27.22 llb