• EV Charger Pre-Installation Survey

    EV Charger Pre-Installation Survey

    Please complete all required fields as accurately as possible and with clear photo uploads as per the instructions for each section. Incomplete or inaccurate information may invalidate your estimate, incur additional fitting costs or lead to an aborted installation due to our engineer not having the necessary materials on site.
  • Governing Legislation

    EV charger installations are subject to strict regulations and must comply with BS7671 ("The Wiring Regulations") in general as well as the specific requirements of Section 722 ("Electric Vehicle Charging Installations").
  • Contact Details

  • Format: 00000 000000.
  • Charger Details

    Preferred manufacturer and configuration
  • Preferred manufacturer*
  • Pod Point Connector Type*
  • Zappi Connector Type*
  • Wallbox Connector Type*
  • Ohme Connector Type*
  • Hypervolt Connector Type*
  • Other Connector Type*
  • Do you have solar panels?*
  • Do you require solar integration?*
  • Supply Details

    This is to establish whether your supply infrastructure is suitable
  • Image field 21
  • Service cut-out/fuse

    Service cut-out/fuse

  • Is your supply looped?*
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Supplier's meter

    Supplier's meter

  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Supplier's isolator switch

    Supplier's isolator switch

  • Do you have a separate isolator switch?*
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Earthing and Bonding Checks

    This is to determine if your equipotential earth bonding complies with safety regulations
  • Gas meter bonding

    Gas meter bonding

  • Look at the incoming pipe to your gas meter. This is usually located behind the valve on the rear, top left. Is it...?*
  • Is there a green/yellow wire connected to the outgoing copper pipe on your gas meter, like in the picture above?*
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Water bonding

    Water bonding

  • Look at the incoming pipe to your water stop tap. Is it...?*
  • Is there a green/yellow wire connected to the outgoing metal pipe, similar to the picture above?*
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Consumer Unit

    This is to determine if the charger can be connected to your existing consumer unit
  • Location/Accessibility

    Location/Accessibility

  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Circuits

    Circuits

  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Are your main cut-out and consumer unit within 3m of each other?*
  • Does your consumer unit contain at least 1 spare way or unused circuit?*
  • Does your consumer unit contain any RCDs?*
  • Does your consumer unit contain an SPD (Surge Protection Device)?*
  • What make are your circuit breakers?*
  • Charger Position

    This is to determine the location of your charger along with the cable length and route
  • Image field 71
  • Charger location
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Distance of cable run from consumer unit*
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Cable route access (Select all that apply)*
  • Maximum Demand

    This section is to assess the load of all circuits supplying your property and is required to check that your main fuse is adequate and to submit the Notification or Application to the Distribution Network Operator
  • Please select ALL that apply*
  • Review Answers

  • Do you wish to jump to section or review the form before submission?*
  • Results

  • Standard installation
  • Oops! You have a non-standard installation

    We will contact you to discuss your requirements in more detail and find a solution
  • Congratulations! You have a standard installation

  •  / /
  •  