• EV Charger Pre-Installation Survey

    EV Charger Pre-Installation Survey

    Please complete all required fields as accurately as possible and with clear photo uploads as per the instructions for each section. Incomplete or inaccurate information may invalidate your estimate, incur additional fitting costs or lead to an aborted installation due to our engineer not having the necessary materials on site.
  • Governing Legislation

    EV charger installations are subject to strict regulations and must comply with BS7671 ("The Wiring Regulations") in general as well as the specific requirements of Section 722 ("Electric Vehicle Charging Installations").
  • Contact Details

  • Charger Details

    Preferred manufacturer and configuration
  • Supply Details

    This is to establish whether your supply infrastructure is suitable
  • Image-21
  • Service cut-out/fuse

    Service cut-out/fuse

  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Supplier's meter

    Supplier's meter

  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Supplier's isolator switch

    Supplier's isolator switch

  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Earthing and Bonding Checks

    This is to determine if your equipotential earth bonding complies with safety regulations
  • Gas meter bonding

    Gas meter bonding

  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Water bonding

    Water bonding

  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Consumer Unit

    This is to determine if the charger can be connected to your existing consumer unit
  • Location/Accessibility

    Location/Accessibility

  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Circuits

    Circuits

  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Charger Position

    This is to determine the location of your charger along with the cable length and route
  • Image-71
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Maximum Demand

    This section is to assess the load of all circuits supplying your property and is required to check that your main fuse is adequate and to submit the Notification or Application to the Distribution Network Operator
  • Review Answers

  • Results

  • Oops! You have a non-standard installation

    We will contact you to discuss your requirements in more detail and find a solution
  • Congratulations! You have a standard installation

  •  / /
  •  
  • Should be Empty: