• Site Build Out Completion Form

    TEAPIOCA INTERNATIONAL: This form must be filled out by the Franchisee once the site construction is completed.
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • SITE BUILD-OUT COST

  • ARCHITECTURE & STRUCTURAL

  • Signage
    Rows
  • Framing/Drywall
    Rows
  • MECHANICAL

  • HVAC
    Rows
  • PLUMBING

  • Plumbing
    Rows
  • ELECTRICAL

  • Electrical
    Rows
  • OTHER COSTS

  • Permits Cost
    Rows
  • EQUIPMENT

  • Equipment
    Rows
  • TEAVERSE

  • Teaverse
    Rows
  • SITE CONSTRUCTION GRAND TOTAL COST

  • Should be Empty: