• Application for External Changes to a Residence

  • The Covenants require that "No building, fence, wall, antenna, swimming pool or other structure shall be commenced, erected or maintained upon the Properties, nor shall any exterior addition to or change or alteration therein be made until the plans and specifications showing the nature kind, shape, height, materials and location of the same shall have been submitted to and approved in writing as to harmony of external design and location in relation to surrounding structures and topography by the Board of Directors of the Association, or by an architectural committee composed of three (3) or more representatives appointed by the Board. In the event said Board, or its designated committee, fails to approve or disapprove such design and location within the thirty (30) days after said plans and specifications have been submitted to it, approval will not be required and this Article will be deemed to have been fully complied with."

    For further information, the current Planning Guidelines may be found on the trurohomes.org website. To be considered by the committee the application must be submitted via this webform. You may also download a hard copy, print, complete and return to the clubhouse mailbox. The webform is the preferred method.

    Requests for architectural changes must include the following information, as appropriate:

    • Brief description of the project.

    • Drawings, including plans, elevations, and details, as necessary to completely describe the location of the project on the site, and the nature, kind, color, shape, height, length, and width of the project. Applications shall include a copy of the House Location Plat approved by Fairfax County showing the existing yards for the property and a drawing indicating the approximate location of neighboring houses.

    • Specifications describing the specific nature and kind of materials to be used, and workmanship are required in sufficient detail for the Committee to make a decision. For fences, screens and similar projects, the specifications all be included in the letter of request.

    • Written evidence that abutting neighbors, or those to whom the project will be visible (e.g. across the street) are aware of the proposed project.

    • Samples or photographs of similar completed projects may be included and encouraged, if they help explain the project.

    • For major additions or modifications to existing houses complete detailed drawing and specifications are required.


    Submittals to the ACC for review must be received no later than 5 days before the ACC meets (generally the second Tuesday of each month). Other submissions shall be considered untimely and improvidently filed, unless the Committee waives this requirement.

     

    PLEASE BE AS DESCRIPTIVE AS POSSIBLE

  •  - -
  •  - -
  • Exterior Painting

    Please complete the following questions to the best of your ability. The more detail you can provide, the easier it will be for the committee to evaluate your application and offer approval.
  • Have you reviewed the ACC Painting Tips Document? You may also refer to the ACC Planning Guidelines beginning on page 20 for color suggestions.

  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Roofing

    Please complete the following questions to the best of your ability. The more detail you can provide, the easier it will be for the committee to evaluate your application and offer approval.
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Driveways, Walkways, Patios and Paving

    Please complete the following questions to the best of your ability. The more detail you can provide, the easier it will be for the committee to evaluate your application and offer approval.
  • Please refer to page 9 of the ACC Planning Guidelines for information regarding Driveways, patios and paving. Also be sure to familiarize yourself with the Fairfax County ordinances regarding driveways, patios and paving. Your property may be located in a Resource Protect Area as well, which require special permits and considerations for alteration to or addition of driveways, patios and paving.

  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Windows

    Please complete the following questions to the best of your ability. The more detail you can provide, the easier it will be for the committee to evaluate your application and offer approval.
  • Applications to replace exterior windows require the following information to be submitted for committee review.

  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Entry and Garage Doors

    Please complete the following questions to the best of your ability. The more detail you can provide, the easier it will be for the committee to evaluate your application and offer approval.
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Fences and Free Standing Screens

    Please complete the following questions to the best of your ability. The more detail you can provide, the easier it will be for the committee to evaluate your application and offer approval.
  • Please refer to the ACC Planning Guidelines on page 9 for guidelines and page 25 for examples of approved fence styles. 

    It's important to note that front yard boundary fencing is prohibited for all Truro homes. Fences will not be approved if the installation will obstruct sight lines for vehicle or pedestrian traffic and must be in conformity with the architectural character of the community. 

  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Home Additions and Other Projects

    Please complete the following questions to the best of your ability. The more detail you can provide, the easier it will be for the committee to evaluate your application and offer approval.
  • Generally, the nature of these types of requests will likely prompt additional questions or require more input from the ACC. The more information you can provide here, the easier it will be for the ACC to evaluate your request and provide feedback. It is typical for these types of requests to require the homeowner be in attendance for the next upcoming ACC meeting (typically the second Tuesday of the month). Someone will reach out to you to request additional information and/or to let you know that you've been added to the ACC meeting agenda. Attendance at the meeting is strongly encouraged. 

  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Please provide a list of neighbors aware of the project. At least 2 neighbors should be listed.

  • Owners' Acknowledgments: I/we understand and agree:

    • ACC approval of a project does not eliminate the necessity of obtaining the required building permits or other governmental approvals.

    • Obtaining a county building or work permit does not relieve the applicant of the responsibility of obtaining approval of the Committee.

    • Approval of a project by the committee does not negate the applicant's responsibility to execute the project in a workman-like manner.

    • Storage of materials prior to, during and after construction should, if possible, be in an area not visible from the street.

    • Committee approval includes the right to inspect the completed project to assure the execution of the approved plan.

    • Project should be completed as expeditiously as possible so as not to create a
      nuisance or annoyance to the neighborhood. The project should be completed within 6 months unless extended by the committee.

    • No work on the proposed change shall begin until written approval of the ACC has been received. If work is done prior to approval, I may be required to return the property to its former condition at my own expense if this application is disapproved wholly or in part; and I may be required to pay all legal expenses incurred.

    • There shall be no deviations from the plans, specifications, and location approved by the ACC without prior written consent of the ACC. Any variation from the original application must be resubmitted for approval.
  • Clear
  • Reload
  • Should be Empty: