-
-
-
-
-
-
-
-
- Date*
-
-
-
-
-
- 1. Available sprinklers, hose streams, and extinguishers are in service and operable.*
- 2. Hot-work equipment is in good working condition in accordance with manufacturer's specifications.*
-
- 3. Flammable liquid, dust, lint, and oily deposits removed.*
- 4. Explosive atmosphere in area is eliminated. LEL measured at*
- 5. Floors swept clean and trash removed.*
- 6. Combustible floors wet down or covered with damp sand or fire-resistive/noncombustible materials or equivalent.*
- 7. Workers are protected from electrical shock when floors are wet.*
- 8. Other combustible storage material removed or covered with listed or approved materials (welding pads, blankets, or curtains; fire-resistant tarpaulins), metal shields, or noncombustible materials.*
- 9. All wall and floor openings covered.*
- 10. Ducts and conveyors that might carry sparks to distant combustible material are covered, protected, or shut down.*
-
- 11. Construction is noncombustible and without combustible coverings or insulation.*
- 12. Combustible material on other side of walls, ceilings, or roofs is moved away.*
-
- 13. Enclosed equipment is cleaned of all combustibles.*
- 14. Containers are purged of flammable liquid/vapor.*
- 15. Pressurized vessels, piping, and equipment removed from service, isolated, and vented.*
-
- 16. Fire watch is provided during and for a minimum of 30 min. after hot work, including break activity.*
- 17. Fire watch is provided with suitable fire extinguishers and, where practical, a charged small hose.*
- 18. Fire watch is trained in use of equipment and in sounding alarm.*
- 19. Fire watch can be required in adjoining areas, above and below.*
- 20. As per the PAI/fire watch, monitoring of hot-work area has been extended beyond 30 min.*
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
- Should be Empty: