• Nordic PCL HSE OPERATING PROCEDURES

    Trenching and Excavation Procedure HSEOP-05-04

  • DAILY TRENCHING & EXCAVATION SAFETY CHECKLIST

  • Select the Soil Type*
  • Slope ratio correct?*
  • Shoring installed as per design?*
  • Shielding in place?*
  • Access/Egress provided?*
  • Barricades erected?*
  • Water removed / seepage controlled?*
  • Traffic control in place?*
  • Spoil Pile 3 feet from edge?*
  • Any cracks in walls?*
  • Signs of caving or sloughing?*
  • Areas of unusually weak soil?*
  • Weather threatening?*
  • Date*
     / /
  •  
  • Should be Empty: