Civil Works Point of Work Risk Assessment Logo
  • Civil Works Point of Work Risk Assessment

  • Before you start tick appropriate boxes and ensure ALL SECTIONS ARE COMPLETED

  • Civil Works Point of Work Risk Assessment

    If the hazard is present please tick the relevant box
  • Civil Works Point of Work Risk Assessment

  •  
  • Safe Dig Hierarchy for Breaking Ground

    If any form of mechanical power tools are utilised please state below why steps 1,2 &3 have been bypassed and note what control measures will be utilised in section 2b of this document. Excavators and hand held power tools should not be utilised to break ground above shallow services.

    1. Air Lance & compressor
    2. Vac ex Machine
    3. Insulated hand tools
    4. Mechanical power tools

  • Should be Empty: