• Pre-Commissioning Checklist

    Pre-Commissioning Checklist

    Private (Non-Adoptable) Packaged Pumping Stations
  • Site and Site Contact Details

  • Format: 00000-000-000.
  • Are you the main point of contact on site*
  • Format: 00000-000-000.
  • Site Parking, Induction and RAMS

    Please answer all the following questions accurately
  • Is there clear access for a van to safely park within 100 metres of the wet well, kiosk or control panel?*
  • Please confirm the time of the site induction*
  • Please confirm the length of the induction*
  • How long before site attendance are RAMS required on site?*
  • Checklist

    Please answer all the following questions accurately
  • To ensure the success of the commissioning visit, please complete and submit this form for each pumping station that requires commissioning. The commissioning date will be confirmed once we receive the completed form, please note that 5 working days notice is required for commissioning prior to our engineers attending, please ensure the following checklist has been accurately completed.

    Ensuring the accuracy of this form completion is critical to avoid unnecessary delays and additional costs. 

    If any of the following information is incomplete or inaccurate on attendance to site, this will result in an aborted visit charge of £650.00 + VAT.

    Please note, commissioning is unable to commence until all the items on this checklist are marked as 'Completed'. Should you require further information, please email operations@pump.net or call +44(0)1189 866 101.

  • Labelled Imaged of Typical Packaged Pumping Stations

    (for guidance only)
  • Image field 167
  • Please advise the length of cable required to reach from the bottom of the chamber, through the cable ducts (or other cable containment systems) to reach the location where the control panel will be mounted - Please note that any cable beyond 1-5 metres will incur an additional cable cost (for further information, refer to figure 2.1 below )*
  • Image field 171
  • As additional cable is required, please select which would you prefer*
  • All cable containment has been supplied and installed by others*
  • Will the additional cable need to installed within any of the following cable containment? Please select all that apply
  • WORK TO BE UNDERTAKEN BY PARADIGM

    1. Install pumps by lowering into the tank, and set float switches at the required depth.
    2. Pull extra cable (if agreed in writing with the client)
    3. Pull pump & float switch cables through the cable duct, and connect to the control panel.
    4. When power has been connected to the control panel, test and commission the installation.

    If any additional items are required, please notify Paradigm as soon as possible, to reduce any delays or costs arising from the additional items.

    No confined space works or working at height is required to commission this pumping station.

    If any further information is required, in terms of technical data or drawings, please feel free to ask by emailing operations@pump.net or call +44(0)1189 866 101.

  • Should be Empty: