Enduser Installation Quote Request
  • Enduser Installation Quote Request

    Install Checklist, please complete and return
  • Safety Requirements

  • PPE Required (Check all that apply)
  • Safety Orientation/Training
  • Drug Testing
  • Background Check
  • Site access forms or other required paperwork
  • Will union labor be required?
  • OSHA card required?
  • Security clearance required?
  • Any special welding requirements on site?
  • Type of Service Requested

  • Service
  • Building Type
  • Environment
  • Application
  • Annual service and preventive maintenance?
  • * Site visits may be required for jobs using shaft ways, thru-floors, and/or sites with demolition involved.

  • Site Description

    Please e-mail pictures of jobsite to : sdennis@countdowncityllc.com
  • Work area and path to install site clear and free of obstructions?
  • Concrete surface level and smooth? (Pit square with clean corners?)
  • Are there obstructions(including conduit, air, and water lines etc)where the VRC will be installed?
  • Will non-scuff tires, bibs, or diapers be required on-site?
  • Are there dumpsters on-site that install crew can use?
  • Can crew work weekends?
  • Will an appointment be needed for material delivery?
  • Will there be inspections during the install?
  • Should be Empty: